Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 14, 2026 at 8:00 PM
Updated July 23, 2026
Demolition, site work and new construction of a transportation facility in Park City, Utah. Completed plans call for the demolition of a transportation facility; for the construction of a transportation facility; and for site work for a transportation facility.
The existing KJTC was constructed in 2016 using federal and local funds. As the area has grown and the demand for transit services has increased, this transit center will be demolished and reconstructed. The new KJTC will serve as the northern anchor of the S.R.224 corridor and will function as a primary hub for local and regional bus services, micro transit, commuter parking, and active transportation connections. The KJTC's design, as outlined in Concept Design Engineering Drawing in Appendix A, is envisioned to include o Bus bays and operational areas to support current and future service levels o Customer amenities and compact retail; o Passenger waiting areas with family friendly amenities; o Pedestrian circulation and safety enhancements; o Facilities that support seamless access to the S.R. 224 BRT corridor and local services; o Overhead electric bus charging infrastructure; o Pedestrian connection to podium level of the adjacent P3 development; o 10,000 square-foot administration building. Design of the KJTC Project started in March 2026 and will be complete in early 2027. Construction is anticipated to begin in Spring 2027 with commission completed on or before October 2028. High Valley Transit District (HVT) has entered into a Public-Private Partnership (P3) Agreement with Summit County and Park City Junction LLC to relocate HVT's existing Kimball Junction Transit Center (KJTC). The existing site will be demolished and HVT will operate in a temporary facility at the Summit County PEAK building parking area until the new transit center is opened in 2028. Question Deadline 07/02/2026 at 2:00 PM MT All questions shall be submitted in writing to Bonfire by Online. Construction Manager/General Contractor (CM/GC) services for the relocation of the Kimball Junction Transit Center, including demolition of the existing site and coordination of a new transit center facility. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
$15,000,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
