Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 21, 2026 at 8:00 PM
Updated September 27, 2026
Site work for a playground / park / athletic field in Chardon, Ohio. Completed plans call for site work for a playground / park / athletic field.
Construction of a boardwalk. Bonds: 10% Bid Bond, Certified Check required, 100% Performance Bond. Summary of Scope of work outlined in Contract Drawings and Details: Phase 1 : Keep driveway and roadway clear of sediment. Return any sediment to the construction site immediately. Install compost filter sock prior to any risk of runoff and maintain through duration of construction. Remove at project completion. Maintain existing parking lot in passable condition during construction. Use parking lot for laydown, storage, and parking. Restore to pre-construction condition with grading and additional gravel or asphalt millings as needed. Use existing grass pathway to the boardwalk for access. Stop machine access at the end of grass path at start of boardwalk. Restore grass pathway to pre-construction condition or better, with screened topsoil, shady seed mix, and straw mulch. Contractor is responsible for layout of boardwalk. Cut off vegetation as needed for construction access along boardwalk route. Lay material neatly aside, or remove from site. Leave stumps and herbaceous plants for regrowth. Install Phase 1 boardwalk frame and railings. Close off west end of boardwalk with railing until Phase 2 work commences. Install boardwalk decking option as chosen by Munson Township. Phase 2 : Keep driveway and roadway clear of sediment. Return any sediment to the construction site immediately. Install compost filter sock prior to any risk of runoff and maintain through duration of construction. Remove at project completion. Maintain existing parking lot in passable condition during construction. Use parking lot for laydown, storage, and parking. Restore to pre-construction condition with grading and additional gravel or asphalt millings as needed. Use existing grass pathway to the boardwalk for access. Stop machine access at the end of grass path at east end of boardwalk. Restore grass pathway to pre-construction condition or better, with screened topsoil, shady seed mix, and straw mulch. Contractor is responsible for layout of boardwalk. Cut off vegetation as needed for construction access along boardwalk route. Lay material neatly aside, or remove from site. Leave stumps and herbaceous plants for regrowth. Remove railing at west end of Phase 1 boardwalk. Install Phase 2 boardwalk frame and railings. Install boardwalk decking option as chosen by Munson Township. Award is subject to final approval.
Award
$260,353.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 21, 2026
August 1, 2026
12250 Auburn Rd, Chardon, OH
Related To This Project
Chardon, OH
Bid Date: Jul 15 2026
Chardon, OH
Bid Date: Aug 28 2026
Chardon, OH
Bid Date: Sep 03 2026
Chardon, OH
Bid Date: Sep 16 2026
Chardon, OH
--
Chardon, OH
Bid Date: Oct 21 2026
Chardon, OH
Bid Date: Jul 30 2026
Chardon, OH
Bid Date: Aug 25 2026
Chardon, OH
--
Chardon, OH
--
Chardon, OH
--
Chardon, OH
Bid Date: May 21 2026
Chardon, OH
Bid Date: May 01 2026
Chardon, OH
Bid Date: May 29 2026
Chardon, OH
Bid Date: May 22 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed