BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 27, 2026 at 8:00 PM

Updated July 8, 2026

Site work for a playground / park / athletic field in Chardon, Ohio. Completed plans call for site work for a playground / park / athletic field.

Construction of a boardwalk. Bonds: 10% Bid Bond, Certified Check required, 100% Performance Bond. Summary of Scope of work outlined in Contract Drawings and Details: Phase 1 : Keep driveway and roadway clear of sediment. Return any sediment to the construction site immediately. Install compost filter sock prior to any risk of runoff and maintain through duration of construction. Remove at project completion. Maintain existing parking lot in passable condition during construction. Use parking lot for laydown, storage, and parking. Restore to pre-construction condition with grading and additional gravel or asphalt millings as needed. Use existing grass pathway to the boardwalk for access. Stop machine access at the end of grass path at start of boardwalk. Restore grass pathway to pre-construction condition or better, with screened topsoil, shady seed mix, and straw mulch. Contractor is responsible for layout of boardwalk. Cut off vegetation as needed for construction access along boardwalk route. Lay material neatly aside, or remove from site. Leave stumps and herbaceous plants for regrowth. Install Phase 1 boardwalk frame and railings. Close off west end of boardwalk with railing until Phase 2 work commences. Install boardwalk decking option as chosen by Munson Township. Phase 2 : Keep driveway and roadway clear of sediment. Return any sediment to the construction site immediately. Install compost filter sock prior to any risk of runoff and maintain through duration of construction. Remove at project completion. Maintain existing parking lot in passable condition during construction. Use parking lot for laydown, storage, and parking. Restore to pre-construction condition with grading and additional gravel or asphalt millings as needed. Use existing grass pathway to the boardwalk for access. Stop machine access at the end of grass path at east end of boardwalk. Restore grass pathway to pre-construction condition or better, with screened topsoil, shady seed mix, and straw mulch. Contractor is responsible for layout of boardwalk. Cut off vegetation as needed for construction access along boardwalk route. Lay material neatly aside, or remove from site. Leave stumps and herbaceous plants for regrowth. Remove railing at west end of Phase 1 boardwalk. Install Phase 2 boardwalk frame and railings. Install boardwalk decking option as chosen by Munson Township.

Sub-Bidding

$500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
271
Active Projects
25
Bidding Soon
2,715
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.