Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 7, 2026 at 8:00 PM
Updated July 9, 2026
Site work and renovation of a fire / police facility in St George, Utah. Completed plans call for the renovation of a 18,257-square-foot fire / police facility; and for site work for a fire / police facility.
Project No. 26-294 The City of St. George is seeking qualified general contractors to perform alterations to three existing buildings comprising the St. George Police Department (SGPD) Campus. The project involves interior reconfigurations, mechanical system upgrades, and exterior improvements across all three structures: the Alpha, Bravo, and Charlie Buildings. Design documents have been prepared by FFKR Architects and will be provided to contractors upon solicitation. All work shall be performed in strict accordance with those construction documents, applicable building codes, and any City of St. George specifications referenced therein. The City of St. George is seeking qualified general contractors to perform alterations to three existing buildings comprising the St. George Police Department (SGPD) Campus. The project involves interior reconfigurations, mechanical system upgrades, and exterior improvements across all three structures: the Alpha, Bravo, and Charlie Buildings. Design documents have been prepared by FFKR Architects and all work shall be performed in strict accordance with those construction documents, applicable building codes, and any City of St. George specifications referenced therein. The 100% performance - labor and materials bond will be required on this project. The City of St. George reserves the right to reject any or all SUBMISSIONS or to waive any formality or technicality in any PROPOSAL in the interest of the city. Alterations to three existing buildings (Alpha, Bravo, and Charlie) of the St. George Police Department (SGPD) Campus, including interior reconfigurations, mechanical system upgrades, and exterior improvements. Bonds: 100% Performance Bond, 100% Payment Bond. July 7 - Last day for RFI's and Substitution Requests - 2 pm July 13 - Final Addendum Issued July 20 - Bid Due Date - 2 pm
GC Bidding
$1,500,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
4157 Rain Tree St, St George, UT
Related To This Project
St George, UT
--
St George, UT
--
St George, UT
--
St George, UT
--
St George, UT
Bid Date: Jun 16 2026
St George, UT
Bid Date: Jun 12 2026
St George, UT
Bid Date: Jun 16 2026
St George, UT
Bid Date: Jun 11 2026
St George, UT
Bid Date: Jun 12 2026
St George, UT
Bid Date: Jun 24 2026
St George, UT
Bid Date: Jun 11 2026
St George, UT
Bid Date: May 01 2026
St George, UT
Bid Date: Apr 21 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
