Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 7, 2026 at 8:00 PM

Updated September 13, 2026

Site work and renovation of a fire / police facility in St George, Utah. Completed plans call for the renovation of a 18,257-square-foot fire / police facility; and for site work for a fire / police facility.

Project No. 26-294 The City of St. George is seeking qualified general contractors to perform alterations to three existing buildings comprising the St. George Police Department (SGPD) Campus. The project involves interior reconfigurations, mechanical system upgrades, and exterior improvements across all three structures: the Alpha, Bravo, and Charlie Buildings. Design documents have been prepared by FFKR Architects and will be provided to contractors upon solicitation. All work shall be performed in strict accordance with those construction documents, applicable building codes, and any City of St. George specifications referenced therein. The City of St. George is seeking qualified general contractors to perform alterations to three existing buildings comprising the St. George Police Department (SGPD) Campus. The project involves interior reconfigurations, mechanical system upgrades, and exterior improvements across all three structures: the Alpha, Bravo, and Charlie Buildings. Design documents have been prepared by FFKR Architects and all work shall be performed in strict accordance with those construction documents, applicable building codes, and any City of St. George specifications referenced therein. The 100% performance - labor and materials bond will be required on this project. The City of St. George reserves the right to reject any or all SUBMISSIONS or to waive any formality or technicality in any PROPOSAL in the interest of the city. Alterations to three existing buildings (Alpha, Bravo, and Charlie) of the St. George Police Department (SGPD) Campus, including interior reconfigurations, mechanical system upgrades, and exterior improvements. Bonds: 100% Performance Bond, 100% Payment Bond. July 7 - Last day for RFI's and Substitution Requests - 2 pm July 13 - Final Addendum Issued July 20 - Bid Due Date - 2 pm

Award

$5,644,385.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
9
Bidding Soon
178
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2026

August 17, 2026

Project location map

265 N 200 E, St George, UT

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed