BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 29, 2026 at 8:00 PM

Updated July 7, 2026

Site work and paving for a mixed-use development in Gallup, New Mexico. Completed plans call for site work for a development; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Navajo -Gallup Water Supply Project (NGWSP) - Block 2-3 Pipeline - New Mexico Project The principle components of the Block 2-3 Pipeline include, but are not limited to, the following: Provide 1. Approximately 6.0 miles of 42-inch diameter buried water transmission pipe. 2. Approximately 5.9 miles of 48-inch diameter buried water transmission pipe. 3. Two 0.3 million-gallon ground level storage tanks, yard, and access road. 4. Wash crossings. 5. Bored crossings. 6. Precast manhole structures. 7. Concrete thrust collars, tapers, and encased miter bends. 8. Buried manholes. 9. Valves, air valves, and blowoffs. 10. Road crossings. 11. Utility crossings. 12. Erosion control. 13. Cathodic protection. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

$150,000,000.00

Public - Federal

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
2
Bidding Soon
85
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.