Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 8, 2026 at 8:00 PM
Updated July 14, 2026
Demolition, site work and new construction of a municipal facility in Belchertown, Massachusetts. Completed plans call for the demolition of a municipal facility; for site work for a municipal facility; and for the construction of a municipal facility.
The work includes: All permitting, demolition, surface preparation, testing, temporary protection, phasing, placement and maintenance of barriers, labor, equipment, materials and accessories necessary to perform all work associated with the Massachusetts Water Resources Authority DCR Quabbin Maintenance Building Project, located in Belchertown Massachusetts, Each Filed Sub-Bid must be accompanied by a current Certificate of Eligibility issued by DCAMM showing that the Sub-Bidder has been certified to participate on public construction projects and perform the class of work for which the Sub-Bid is submitted. Division Sub-trade 4 Masonry Work 5 Miscellaneous and Ornamental Iron Railings 9 Painting 15 Fire Protection 15 Plumbing 15 HVAC Electrical This contract is subject to a 7.24% MBE and a 3.6% WBE participation requirement The Work shall include all permitting, demolition, clearing and grubbing, trees removal and protection, disposal of site preparation and construction waste, surface preparation, testing, temporary protection, phasing, placement and maintenance of barriers, labor, equipment, materials and accessories necessary to perform all work associated with the Massachusetts Water Resources Authority DCR Quabbin Maintenance Building Project, located in Belchertown, Massachusetts, in accordance with the Contract. Refer to the appropriate Specification section for further information about responsible entity, preparation, and installation methods with components to be provided. Refer to the Contract Drawings for limits of the scope of work. Refer to Section 1.03 for the summary of work A. Furnish and install 8,800 sf pre-engineered metal building containing the following: 1. 5 Maintenance bays i. Vehicle lifts ii. Trench drains 2. Equipment wash bay 3. Storage mezzanine i. Interior and Exterior Stair ii. Hoist and Trolley iii. Guardrail and Trolley Gate 4. Covered Patio 5. Hazardous storage room 6. Office space i. Break/snackbar, locker, toilet, and shower areas 7. Mechanical spaces 8. Electrical rooms 9. Waste Oil furnace 10. Heated slab 11. Vehicle exhausting system 12. Vehicle maintenance equipment B. Furnish and install 800 SF pre-engineered metal water systems building containing the following: 1. Fire protection room i. Wet well ii. Diesel tank iii. Mechanical heaters iv. Pump controllers 2. Water treatment room i. Potable water storage tank ii. Water management and treatment equipment iii. PLC monitoring and control panel iv. Pressure tanks v. Distribution pumps
Sub-Bidding
$6,170,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
251 Blue Meadow Rd, Belchertown, MA
Related To This Project
Belchertown, MA
--
Belchertown, MA
Bid Date: May 15 2026
Belchertown, MA
Bid Date: Jun 04 2026
Belchertown, MA
Bid Date: Jun 04 2026
Belchertown, MA
Bid Date: Jun 04 2026
Belchertown, MA
Bid Date: Jun 04 2026
Belchertown, MA
Bid Date: Apr 23 2026
Belchertown, MA
Bid Date: Jun 11 2026
Belchertown, MA
Bid Date: Feb 19 2026
Belchertown, MA
Bid Date: Feb 19 2026
Belchertown, MA
Bid Date: Mar 05 2026
Belchertown, MA
Bid Date: Jan 30 2026
Belchertown, MA
Bid Date: Dec 19 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
