Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 6, 2026 at 8:00 PM
Updated July 8, 2026
This is a service / maintenance or supply contract in Oklahoma City, Oklahoma. Contact the soliciting agency for additional information.
July 2, 2026 Industry Day July 22, 2026 See attached agenda for details. Provide comprehensive cradle-to-grave engineering project management, execution, and technical support services to support the installation's built infrastructure portfolio. Work includes delivering an optimally sized on-site team to perform full lifecycle project management for decentralized Facilities Sustainment, Restoration, and Modernization (dFSRM) and Oklahoma City Air Logistics Complex maintenance and repair programs, including planning, programming, development of project requirements and design packages, independent government estimates, solicitation support, and construction management using the Three-Phase Quality Control process. Services also include foundational engineering support such as management of the Installation Geospatial Information and Services (GeoBase) program, master record drawings, engineering evaluations and root-cause analysis, excavation permit program oversight, airfield maintenance support, warranty management, and real property closeout. The effort further requires operations engineering support through asset management, BUILDER sustainment system execution, and lifecycle planning for designated customers, as well as the capability to scale through an IDIQ structure to support surge and specialized workloads. This includes full lifecycle management for complex projects, requirements development and A\&E design management, acquisition support for new contract vehicles, construction inspection augmentation, and external agency liaison services. The contractor must deliver a highly qualified workforce, maintain strict data integrity in government systems, and support knowledge transfer, SOP development, and transition of functions to government performance over the life of the contract. The Method of Contractor Selection has not been determined at this Time.
Conceptual
Public - Federal
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
To Be Determined, Oklahoma City, OK
Related To This Project
Oklahoma City, OK
--
Oklahoma City, OK
--
Oklahoma City, OK
--
Oklahoma City, OK
--
Oklahoma City, OK
--
Oklahoma City, OK
--
Oklahoma City, OK
--
Oklahoma City, OK
--
Oklahoma City, OK
--
Oklahoma City, OK
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
