Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 25, 2026 at 8:00 PM
Updated July 8, 2026
Site work for an educational facility in Frisco, Texas. Completed plans call for site work for a educational facility.
Collin College is seeking qualified proposals for the Frisco Campus Chilled and Heating Water Loop Extension. Work must be completed during Fiscal Year 2027, pending approval by the Board of Trustees. The project requires extreme coordination to ensure no disruption to campus heating or cooling needs. The campus must remain operational during normal business hours, so any planned temporary shutdowns must occur outside of those hours and be coordinated with the college at least two weeks in advance. Excavation will occur in various locations throughout the campus. The contractor is responsible for restoring the site to its original condition or better and bears responsibility for any underground utility or property damages. The contractor should perform due diligence to identify all underground utilities or obstructions. Contractors are expected to identify and propose value engineering opportunities. Proposals must include costs for double shifts and/or 7 day work weeks if needed to meet the project timeline, including work during specifically designated shut-down windows. A project schedule must be submitted with each proposal. Contractors must identify and inform the college about all long lead items (10 weeks or more). The intent of the project is to replace aging equipment and infrastructure, and to increase the cooling and heating capacity from the Central Utilities Plant. Deadline for question submission by electronically Question Deadline 07/14/2026 at 12:00 PM CT Base Scope: A. Apply for and provide all necessary documents required for successful permitting through the applicable governing body. B. Provision of a chilled and heating water system interconnector combining the existing North and East spines into a campus loop. C. Installation of (2) new main isolation valve junctions with surface operated groundhog type butterfly valves. D. Installation of approximately 540 linear feet of campus buried chilled and heating water piping, and associated revisions to property landscape and paving. E. Replacement and upsizing of approximately 370 linear feet of campus buried chilled and heating water piping, and associated revisions to property landscape and paving. F. Coordination of the piping route with existing utilities and below grade infrastructure such as irrigation, site lighting, etc. G. Perform all other work as specified in drawings and specifications H. Testing, Adjusting, and Balancing (TAB) work may need to be done on nights and weekends after substantial completion date
GC Bidding
$3,000,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
9700 Wade Blvd, Frisco, TX
Related To This Project
Frisco, TX
--
Frisco, TX
--
Frisco, TX
--
Frisco, TX
--
Frisco, TX
--
Frisco, TX
--
Frisco, TX
--
Frisco, TX
--
Frisco, TX
--
Frisco, TX
--
Frisco, TX
--
Frisco, TX
Bid Date: Jun 24 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
