BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 29, 2026 at 8:00 PM

Updated July 8, 2026

Site work and paving for a road / highway in Redlands, California. Conceptual plans call for site work for a road / highway.

The City seeks professional engineering consulting services to evaluate, develop, and design a pedestrian crossing improvement along Citrus Avenue between the north and south campuses of Redlands High School. Online Q&A Online Q&A Yes Q&A Deadline 07/08/2026 4:00 PM (PDT) Redlands High School operates two campuses located on opposite sides of Citrus Avenue. Throughout the school day, hundreds of students, faculty, and staff cross Citrus Avenue between class periods. Although the crossing is currently controlled by pedestrian-activated traffic control measures, conflicts between pedestrians and vehicular traffic continue to occur. The existing at-grade crossing presents safety concerns due to high pedestrian volumes, driver inattentiveness, traffic delays, and operational impacts to emergency response vehicles. The City desires to evaluate grade-separated crossing alternatives that improve pedestrian safety, maintain traffic operations, and provide a long-term transportation solution. The primary objectives of the project are to: • Improve pedestrian safety for students, faculty, and staff crossing Citrus Avenue. • Reduce vehicle-pedestrian conflicts along the corridor. • Minimize traffic congestion and operational delays caused by frequent pedestrian crossings. • Improve emergency vehicle access and response times. • Enhance bicycle and pedestrian connectivity between the two campuses. • Develop a constructible and financially feasible grade-separated crossing solution.

Conceptual

$8,000,000.00

Public - City

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
521
Active Projects
59
Bidding Soon
3,653
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

W Citrus Ave, Redlands, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.