Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 25, 2026 at 8:00 PM
Updated July 8, 2026
Renovation of a military facility in Arlington, Virginia. Conceptual plans call for the renovation of a military facility.
Five (5) Roof Inlet Drain Line Pipes (See attached Reference Sheet 1 and 2) 2.1. Selective Demolition Roof drain piping work shall not be performed during rain event or when roof has or holds water that requires roof drain operation. 2.1.1. Roof Drain #1 (All Purpose Room) • Existing fire sprinkler-head is near work area. Care shall be taken while accessing work area and performing repair work and should not directly impact or affect repair work under this requirement. Fire sprinkler lines shall not be disturbed. • Carefully remove and retain approximate 20 square feet (SF) ceiling tiles to access drain line pipe from roof drain inlet and maintain for re-use. Maintain existing drop ceiling grid. 2.1.2. Roof Drain #2 (All Purpose Room) • Carefully remove drain line cap to open drain line piping to perform lining repair work and retain for use. • Existing fire sprinkler-head is near work area. Care shall be taken while accessing work area and performing repair work and should not directly impact or affect repair work under this requirement. Fire sprinkler lines shall not be disturbed. • Carefully remove and retain approximate 20 square feet (SF) ceiling tiles to access drain line pipe from roof drain inlet and maintain for re-use. Maintain existing drop ceiling grid. • Carefully remove drain line cap to open drain line piping to perform pipe-lining repair work and retain for use. 2.1.3. Roof Drain #3 (Coat Room) • Existing fire sprinkler-head is near work area. Care shall be taken while accessing work area and performing repair work and should not directly impact or affect repair work under this requirement. Fire sprinkler lines shall not be disturbed. • Approximate 15 SF gypsum board ceiling has been removed to expose roof drain inlet during previous rainstorm. • Carefully remove drain line cap to open piping to perform pipe-lining repair work and retain for use.
Conceptual
$2,000,000.00
Public - Federal
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
101 Carpenter Rd, Arlington, VA
Related To This Project
Arlington, VA
--
Arlington, VA
--
Arlington, VA
--
Arlington, VA
--
Arlington, VA
--
Arlington, VA
--
Arlington, VA
--
Arlington, VA
--
Arlington, VA
--
Arlington, VA
--
Arlington, VA
--
Arlington, VA
--
Arlington, VA
--
Arlington, VA
--
Arlington, VA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
