BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 27, 2026 at 8:00 PM

Updated July 8, 2026

Site work and renovation of a municipal facility in Old Bridge, New Jersey. Completed plans call for the renovation of a municipal facility; and for site work for a municipal facility.

Replacement of guide rails at the municipal complex. The Township of Old Bridge is seeking proposals for the removal of approximately 60 linear feet of wood guide rail and the supply, delivery and installation of approximately 160 linear feet of Merritt Parkway type steel-backed timber guide rail . The existing guiderail is located within the Old Bridge Township Municipal Complex, 1 Old Bridge Plaza Old Bridge New Jersey 08857, adjacent to the Tennis Court, see Figure 1 Project Location Map Scope of Work The Contractor shall furnish all labor, materials, equipment, tools, supervision, and incidentals necessary to remove existing guide rail and install new Merritt Parkway Type Steel-Backed Timber Guide Rail at the project location. The work is to generally consists of the following: 1. Mobilization One (1) time complete mobilization for the project site. Contractor required to provide traffic control measures as required during the removal of the existing guiderail and installation of the new guide rail. Measures may include providing traffic drums, cones, signage, trained flaggers 2. Removal of Existing Guide Rail Remove approximately sixty (60) linear feet of existing wood guide rail and associated appurtenances as necessary to facilitate installation of the new guide rail system. Post holes are to be filled and compacted Dispose of all removed materials off-site in accordance with applicable regulations. Photos of the existing wood guiderail have been provided for review. Steel I-Beam Post 8-inch depth Steel I-Beam Post 5-inch width Steel post appear to be driven into ground Contractor should field verify existing conditions before submitting quote. 3. Installation of New Guide Rail Furnish and install approximately one hundred sixty (160) linear feet of Merritt Parkway Type Steel-Backed Timber Guide Rail System as per attached plan entitles "Municipal Complex Guide Rail Replacement Construction Plan" dated June 23 , 2026, Sheet 1 of 1 . Guide rail system shall conform to the following requirements:

GC Bidding

$1,500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,114
Active Projects
128
Bidding Soon
8,170
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

1 Old Bridge Plaza, Old Bridge, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.