BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 25, 2026 at 8:00 PM

Updated July 8, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Carthage, Missouri. Completed plans call for the demolition of a bridge / tunnel.

Removal and replacement of an existing 25-foot-long multi-span steel girder bridge with a new double cell 10' span x 5' tall reinforced concrete box culvert including embankment, riprap, excavation, roadway improvements, and asphalt paving. Work includes culverts, waterways, stormwater channels, aggregate, crushed stone rip rap, sitework excavating and grading, landscaping, stormwater improvements, erosion control (temporary), and paving (highway, road or street).

GC Bidding

$500,000.00

Public - County

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
8
Bidding Soon
670
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

To Be Determined, Carthage, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.