Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 22, 2026 at 8:00 PM
Updated July 27, 2026
Renovation of a detention facility in New York, New York. Completed plans call for the renovation of a detention facility.
The contractor shall provide all equipment and labor to remove and replace existing shower partitions with attached changing rooms and bathroom stall partitions on the 2nd through 6th floors of the East Building. Each floor includes a North and South side, with each side containing six bathroom stalls and seven shower stalls with changing rooms. Changing rooms shall be 39.5 inches deep and include a door. All partitions shall be floor- and overhead-braced and constructed with powder-coated steel, 58-inch doors and panels, chrome zamac hardware, and a silver vein finish. Work will take place in occupied housing areas and requires coordination for access and movement. The contractor shall also remove and replace all affected restroom accessories, including grab bars, toilet paper holders, sanitary napkin dispensers, towel bars, soap dispensers, and similar items. The contractor shall provide standard labor and material warranties, and complete all work, including site access coordination, material delivery, removal, installation, testing, and demobilization, within a performance period of 60 calendar days. Location: Metropolitan Detention Center Brooklyn, 80 29th Street, Brooklyn, NY 11232, USA "The Davis-Bacon and Related Acts, apply to contractors and subcontractors performing on federally funded or assisted contracts in excess of $2,000 for the construction, alteration, or repair (including painting and decorating) of public buildings or public works. Davis-Bacon Act and Related Act contractors and subcontractors must pay their laborers and mechanics employed under the contract no less than the locally prevailing wages and fringe benefits for corresponding work on similar projects in the area. The Davis-Bacon Act directs the Department of Labor to determine such locally prevailing wage rates. The Davis-Bacon Act applies to contractors and subcontractors performing work on federal or District of Columbia contracts."
Post-Bid
$950,000.00
Public - Federal
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 17, 2026
August 18, 2026
80 29th St, New York, NY
Related To This Project
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
Bid Date: Jul 24 2026
New York, NY
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
