Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 26, 2026 at 8:00 PM
Updated July 7, 2026
Site work for a water / sewer project in Parker, Colorado. Conceptual plans call for site work for a water / sewer project.
This project involves the construction of an approximately 3,900-foot off-site underground gravity sanitary sewer main and associated infrastructure to serve the Ramblewood Planned Development in Douglas County, Colorado. The line will extend from the southwest portion of the Ramblewood property, crossing through the Hidden Village and Reata South subdivisions, and connecting to existing Pinery Water and Wastewater District infrastructure. The scope includes trenching and directional boring (notably beneath Betts Ranch Road), installation of manholes, a flow metering station, and limited above-ground features such as communication cabinets and electrical pedestals. The system will support 68 single-family residential lots and future development within the Ramblewood PD. Informational Coverage: This project receives automated updates from sources only and will not be actively tracked by our Content team. Information is provided as-is for planning awareness. Should you wish to provide information on this project or are seeking an update, please email contentcase@constructconnect.com.
Conceptual
$3,500,000.00
Public - County
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
9757 Hilltop Rd, Parker, CO
Related To This Project
Parker, CO
--
Parker, CO
--
Parker, CO
Bid Date: Jun 23 2026
Parker, CO
--
Parker, CO
Bid Date: Jul 06 2026
Parker, CO
--
Parker, CO
Bid Date: Jun 12 2026
Parker, CO
Bid Date: May 08 2026
Parker, CO
Bid Date: Apr 22 2026
Parker, CO
Bid Date: May 12 2026
Parker, CO
Bid Date: May 12 2026
Parker, CO
Bid Date: Apr 28 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
