Published July 10, 2026 at 8:00 PM

Updated July 12, 2026

Site work and renovation of a bridge / tunnel in Saint Paul, Minnesota. Completed plans call for the renovation of a bridge / tunnel; and for site work for a bridge / tunnel.

Jacking of girders of Spans 3 & 4 at Pier 3. Installation of replacement bearing assembly. Cleaning and painting of all bridge bearing assemblies. Concrete repairs and special surface finish to exposed concrete substructures. Provision of traffic control and permitting. The Work of this Contract is at the following location . The Work will be located on Metro Transit controlled property with access from State property. 1. Bridge 27878, Blue Line LRT over I-35W in Minneapolis , MN. The project includes maintenance repairs for Bridge 27878 on the METRO Blue Line LRT systems. The Work for this Project includes, but is not limited to the following: B. 1. At Bridge 278787, the CONTRACTOR will jack the girders of Spans 3 and 4 at Pier 3, install a new bearing assembly atop Pier 3 and service all remaining bearing assemblies. CONTRACTOR will clean and paint all bearing assemblies. 2. Additionally, the CONTRACTOR will make concrete repairs and provide a surface finish to all exposed areas of the concrete substructures of Bridge 27878 LRT & wingwalls. 3. The CONTRACTOR will supply the necessary traffic control and obtain permitting from MnDOT, Hennepin County, City of Minneapolis , Metro Transit, and any other permitting organizations. 4. Hours of construction for work below the deck will be defined by traffic control permit restrictions. 5. The Blue Line LRT will be shutdown and the CONTRACTOR will have access to the NB and SB LRT track bays during this shutdown . The CONTRACTOR shall perform the jacking of Spans 3 and 4 at Pier 3 during this shutdown time period. The CONTRACTOR shall not interfere with active LRT operations This CONTRACTOR shall coordinate its activities and cooperatively work with all other contractors retained by the COUNCIL to work on or adjacent to this Project and/or this site. 1. Blue Line State of Good Repair 2. Lake St Station Renovation 3. Franklin Station Renovation 4. MnDOT Bridge Replacement over 35W at University Ave & 4th St. The MCUB participation goal for this contract is 3% The Work of the Project shall be Substantially Completed not later than June 5, 2027. The Work of the Project shall be Fully and Finally Completed not later than November 1 , 2027. Question Deadline 07/17/2026 To receive consideration, questions regarding the Bidding Documents must be submitted in writing no later than 10 days prior to the advertised date for receipt of Bids. Direct inquiries to the Metropolitan Council's Contract Administrator, Kimberley Ruedy, at Kimberley.Ruedy@METC.state.mn.us or 651-602-1132

GC Bidding

$1,500,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
8
Bidding Soon
2,084
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.