BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 28, 2026 at 8:00 PM

Updated August 3, 2026

Site work, paving and new construction of a road / highway in Nankin, Ohio. Completed plans call for the construction of a road / highway; for site work for a road / highway; and for paving for a road / highway.

Construction of a 6' concrete sidewalk and an 11' asphalt shared use path. Includes traffic signal improvements, traffic control, grading, and drainage improvements. Bonds: 100% Bid Bond, 100% Performance Bond, 100% Payment Bond. PROJECT CONSISTS OF THE CONSTRUCTION OF A 6' CONCRETE SIDEWALK ON THE NORTH SIDE OF US 250 AND AN 11' ASPHALT SHARED USE PATH ON THE SOUTH SIDE OF US 250 FROM SUGARBUSH DRIVE TO MONTGOMERY ROAD. PROJECT ALSO INCLUDES TRAFFIC SIGNAL IMPROVEMENTS, TRAFFIC CONTROL, GRADING, AND DRAINAGE IMPROVEMENTS. TOTAL PROJECT LENGTH IS 5,693 FEET. Set-asides: 7% SBE.

Bid Results

$2,096,640.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
364
Active Projects
173
Bidding Soon
3,225
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2026

September 21, 2026

Project location map

US 250, Nankin, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.