Published July 21, 2026 at 8:00 PM

Updated July 27, 2026

Renovation of a power facility in Los Angeles, California. Completed plans call for the renovation of a power facility; and power facility.

Project 1 - Central Plant Improvement: The Central Utility Plant (CUP) Upgrade includes increasing cooling capacity. The current CUP utilizes a 1000-ton centrifugal chiller as well as a chilled water thermal energy storage tank to serve the campus cooling loads. The solar thermal storage tanks and ice storage system will be demolished. The current solar thermal system will be drained and decommissioned. The chilled water pumps will be replaced to supply the added capacity. The condenser pumps and portions of the condenser piping will be replaced to maximize the capacity of the existing cooling towers. This project will also include upgrades to the CUP to meet current codes and standards, including life safety systems, improved acoustical performance of the CUP office, and building structural upgrades. Project 2 - Hydronic Line Replacement: The goal is to replace the entirety of the chilled water and hot water distribution piping. A phased approach will be utilized, including the use of temporary heating and cooling equipment to minimize building shutdowns and system outages during construction. The existing distribution system is located primarily within an underground tunnel system with some portions of direct buried piping. During the design of the PPC, a segment of the chilled water piping failed multiple times and this segment will be replaced under a separate scope of work. The DBE shall coordinate with the latest plans or scope of work for 40J-829.02 Infrastructure - Hydronic Line Replacement. In addition to replacing piping, minor tunnel repairs will be completed, tunnel lighting will be upgraded to LED fixtures, and areas of direct-buried disturbed by piping replacement will be landscaped to match the existing condition. Question Deadline 07/24/2026 at 10:00 AM PT Deadline for submission of questions via Online Q&A. Online Q&A Yes Local, Small , Emerging , Disabled Veteran-Owned Business Participation Goals Applicant shall describe overall LSEDV program in narrative format, including: 1. Specific outreach and contracting provisions made to facilitate LSEDV participation 2. Specific activities and community-based partnerships established or used to identify and support LSEDV participation on the projects; and 3. Specific activities undertaken to help LSEDV with capacity building including but not limited to access skilled labor, bonding, access to capital, mentoring Central Plant Improvement: Estimated Cost of Construction: $4,800,000.00 Construction (Commencement to Substantial Competition): 360 Days Construction (Substantial Competition to Final Competition): 60 Days Hydronic Line Replacement: Estimated Cost of Construction: $31,000,000.00 Construction (Commencement to Substantial Competition): 720 Days Construction (Substantial Competition to Final Competition): 60 Days

GC Bidding

$7,900,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
683
Active Projects
185
Bidding Soon
3,847
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2026

October 12, 2026

Project location map

5800 Fulton Ave, Los Angeles, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.