Published July 15, 2026 at 8:00 PM

Updated July 21, 2026

Site work and new construction of a water / sewer project in Northlake, Texas. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Construction of approximately 12,019 LF of 24-inch water distribution pipeline, including 5 pipeline connections into existing CoFW pipelines, pipe joint replacement, and waterline bypass operations. Question Response Deadline:July 10, 2026, 12:00pm Bonds: 5% Bid Bond, Certified Check required, Performance Bond required (unspecified amount), Payment Bond required (unspecified amount), Maintenance Bond required (unspecified amount). This Contract (Phase 2) will include the construction of the second segment of pipeline for the Northside II 24-inch Water Main project, designated as (WL-B, -C, -D, -E, & -F). The total length of these Waterlines are approximately 12,150 LF of 24-inch waterline pipe, with materials conforming to the City of Fort Worth (DIP, Steel, or Concrete) standard specifications. The project includes, but is not limited to, the following major tasks: o Project front ends are Town of Northlake (NCTCOG standards) o Project Technical Specifications are CoFW standards o Proposed bidders must be CoFW listed and approved for the associated work. All materials, equipment, products, and methods of construction shall be approved by COFW and conform to CoFW specifications. o COFW will provide inspection oversight. o 12,150 LF by open cut and trenchless installation This Contract (Phase 2) will include the construction of the second segment of pipeline for the Northside II 24-inch Water Main project, designated as (WL-B, -C, -D, -E, & -F). The total length of these Waterlines are approximately 12,150 LF of 24-inch waterline pipe, with materials conforming to the City of Fort Worth (DIP, Steel, or Concrete) standard specifications. The project includes, but is not limited to, the following major tasks: o Project front ends are Town of Northlake (NCTCOG standards) o Project Technical Specifications are CoFW standards o Proposed bidders must be CoFW listed and approved for the associated work. All materials, equipment, products, and methods of construction shall be approved by COFW and conform to CoFW specifications. o COFW will provide inspection oversight. o 12,150 LF by open cut and trenchless installation Total Project Duration: 420 Consecutive Calendar Days

Bid Results

$4,699,446.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
474
Active Projects
97
Bidding Soon
4,421
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

Multiple Locations, Northlake, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.