Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 29, 2026 at 8:00 PM

Updated October 5, 2026

Renovation of a mixed-use development in Gainesville, Florida. Completed plans call for the renovation of a medical facility.

This project is a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside requiring the contractor to provide all tools, equipment, materials, labor, supervision, and personnel necessary to complete the EHRM Infrastructure Upgrades and Data Center Construction. The work includes performing all tasks required to fully execute and deliver the project in accordance with the provided specifications and drawings, with a construction magnitude ranging from $20,000,000 to $50,000,000. Certification and Accreditation requirements are not applicable, and no Security Accreditation Package is required. Location: Gainesville VA Medical Center, 1601 Southwest Archer Road, Gainesville, FL 32608 Question Deadline 08/04/2026 at 2:00 PM ET Questions shall be submitted only via e-mail to: Shawn.Tavernia@va.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

$50,000,000.00

Public - Federal

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
285
Active Projects
122
Bidding Soon
1,886
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2026

November 11, 2026

Project location map

1601 Old Archer Rd, Gainesville, FL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed