BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 30, 2026 at 8:00 PM

Updated July 7, 2026

Site work for a bridge / tunnel in Calgary, Alberta. Conceptual plans call for site work for a bridge / tunnel.

BF78903 N-1 Major Bridge Rehabilitation 2:15 WID Canal Bridge on Deerfoot Trail Calgary, AB (WAC0091853). BF78903 S-2 Major Bridge Rehabilitation 2:15 WID Canal Bridge on Deerfoot Trail Calgary, AB (WAC0092042). TIMELINE: Request for Proposals from pre-qualified engineering consultants is underway. This RFP is only open to Associated Engineering Alberta Ltd., GeoMetrix Group Engineering Ltd., and Stantec Consulting Ltd. Construction is tentatively planned for 2028. Further update may be available mid-/late summer 2026. *Budget is unreleased.

Conceptual

$10,000,000.00

Public - State/Provincial

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
0
Bidding Soon
552
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.