Published July 2, 2026 at 8:00 PM

Updated July 8, 2026

Site work and paving for a mixed-use development in Gurnee, Illinois. Completed plans call for site work for a sidewalk / parking lot.

Gurnee Park District - Hunt Club Park Paving - Phase II Work to include but not be limited to access road HMA reconstruction, installation of new HMA pathway, curb and gutter removal and replacement, PCC sidewalk removal and replacement, pavement striping, SESC measures, restoration measures, and all appurtenances necessary to complete the project. Anticipated work to be completed by October 30, 2026 SITE DEMOLITION - Work to include but not limited to all demolition items including removal of existing asphalt parking lot pavement, additional excavation as needed for proposed improvements (i.e. asphalt parking lot/pathway grading, asphalt pathway installation, curb installation, and concrete sidewalk installation), all site grading work, site transition grading, sidewalk panel removal, curb removal, saw cutting, and all other associated improvements. ASPHALT AND CONCRETE - INSTALLATION - Work to include but not limited to all installation of concrete curb and gutter, concrete sidewalk, HMA pathway, and HMA parking lot. Work includes furnishing of additional stone as needed for make-up grade, preparation, and grading of stone base for new pavement, and all stone for subbase of proposed curb and concrete sidewalk work, striping, along with all other associated improvements. RESTORATION - - Work to include all mobilization and demobilization, traffic control and protection as needed, concrete washout and construction entrances, all topsoil furnish and place to meet finished grades, transition grades , and restore all natural drainage patterns, seeding and erosion control blanket, inlet filters, tree protection fencing, silt fencing, and other associated improvements. HMA Reconstruction ( 1.75" HMA Surface Course, 2.25" HMA Binder Course, on Existing Stone Base. Includes Existing Asphalt Demolition and Base Preparation) Curb & Gutter Removal and Replacement PCC Sidewalk Removal and Replacement (5" PCC on 4" CA-6 Stone Base) Pavement Sawcut HMA Pathway (3" HMA Surface Course on 8" Stone Base, Includes Earth Excavation) Paint Pavement Marking- Line 4" Paint Pavement Marking- Line 6" Paint Pavement Marking- Line 12" Paint Pavement Marking- Line 24" Unsuitable Material Removal, Disposal, and Replacement with CA-1 Crushed Aggregate and Geotextile Fabric Drainage Structure Reconstruction

GC Bidding

$700,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
619
Active Projects
39
Bidding Soon
4,776
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.