Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 20, 2026 at 8:00 PM

Updated October 26, 2026

Site work and paving for a mixed-use development in Gilbert, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Contract No. 2025132 0000 MA GIL Town of Gilbert (Stacey Rd Higley Rd to 172nd S) The proposed project is located on Stacey Road from Higley Road to 172nd Street in Maricopa County, within the Town of Gilbert, Arizona. The work consists of paving Stacey Road, constructing curb, gutter and sidewalk on the north side of the road, extending the existing eight-inch water line, and constructing a drainage basin at the northeast corner of the Higley Road and Stacey Road intersection and other related work. The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. Central District Engineering Specialist: Farhana Jesmin Pre-qualification: Yes Question Deadline 08/11/2026 The Department may not answer all questions, and any decision on whether a question is answered will be within the sole discretion of the Department. Any questions received less than three working days prior to the bid opening date may not be answered. AZDOT - Roadway Improvements - Stacey Road Award is subject to final approval.

Award

$1,591,873.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
52
Bidding Soon
1,752
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2026

October 20, 2026

Project location map

E Stacey Rd, Gilbert, AZ

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed