Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 6, 2026 at 8:00 PM
Updated July 8, 2026
Site work for a water / sewer project in Port Saint Lucie, Florida. Completed plans call for site work for a water / sewer project.
Question Deadline 07/14/2026 at 5:00 PM ET Question Response Deadline:July 21, 2026, 5:00pm All questions concerning this IFB must be submitted in writing on the OpenGov Platform during theQuesti on and Answer open period . 2.1. Scope of Work Project Overview The initial phases of the Northport Site redevelopment (Phase 0 & Phase I ) include site clearing, demolition of former wastewater treatment facilities, and construction of a new master stormwater system . These improvements will prepare the site for future civil and vertical development. Later phases (Phase II and beyond) will be procured separately at a future date. Work Included in Phase 0 & Phase I A. Clearing & Grubbing Clearing and Grubbing of approximately 3.5 acres on the north portion of the Northport site. o Removal of vegetation, organic material, debris, and unsuitable surface materials. B. Demolition & Removal Demolition and removal of all structures and systems associated with the former wastewater treatment plant, including: Existing Structures (above-grade and select below-grade) Ponds and basins o Stormwater infrastructure o Miscellaneous appurtenances related to the abandoned plant All demolition debris must be removed from the site and disposed of per applicable regulations. C. Earthwork & Grading o Earthwork quantities are based on existing topographic survey data. o Target finished grade elevations: 15.0'-15.5'. o Target finished floor elevations: 0.5'-1.0' above finished grade. o Contractor must: - Verify and adjust elevations as needed. - Ensure positive drainage to the new stormwater system. - Coordinate with design team if discrepancies arise. D. New Master Stormwater System Construction of the new stormwater system required to support future site development, including: o Stormwater conveyance piping o Inlets, manholes, and structures o Outfalls and discharge points o Any required SFWMD-compliant features System must meet South Florida Water Management District (SFWMD) permitting requirements.
GC Bidding
$1,900,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
To be determined, Port Saint Lucie, FL
Related To This Project
Port Saint Lucie, FL
--
Port Saint Lucie, FL
--
Port Saint Lucie, FL
--
Port Saint Lucie, FL
--
Port Saint Lucie, FL
--
Port Saint Lucie, FL
Bid Date: Jun 30 2026
Port Saint Lucie, FL
--
Port Saint Lucie, FL
--
Port Saint Lucie, FL
--
Port Saint Lucie, FL
Bid Date: May 25 2026
Port Saint Lucie, FL
Bid Date: Jun 24 2026
Port Saint Lucie, FL
--
Port Saint Lucie, FL
Bid Date: May 25 2026
Port Saint Lucie, FL
Bid Date: May 26 2026
Port Saint Lucie, FL
Bid Date: Apr 30 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
