BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 2, 2026 at 8:00 PM

Updated July 8, 2026

Site work for an industrial development in Clearwater, Florida. Completed plans call for site work for a industrial development.

The scope of work includes replacement of the existing manual truck wash pad and its associated equipment; installation of an automatic truck wash; installation of electrical, potable water and sanitary sewer improvements. The contractor shall provide copies of a current Contractor License/Registration with the State of Florida and Pinellas County (if applicable) in the bid response. The contractor shall provide 2 fixed project signs as described in Section III Section 23 of the Contract Documents. The final number of project signs will be determined at the beginning of the project based on the contractor's schedule of work submitted for approval. Additional project signs may be required at no additional cost to the city due to the Contractor's schedule of work. Question Deadline 07/29/2026 at 5:00 PM ET All questions as to the meaning or intent of the Contract Documents are to be directed in writing to the Engineer The work to be completed consists of the furnishing of all labor, materials and equipment, and the performance of all Work included in this Contract. Throughout the project, the Contractor shall cooperate fully with operations staff in order to minimize disruption to facility operations. No facility or structure shall be taken out of service, except those specifically scheduled to be renovated or demolished , without the prior written approval of the Owner or Engineer. Operations and regulatory compliance will take priority over and may impact the construction schedule. This project includes the construction of approximately 6 LF of 6-inch potable water main and a 12"x6" tapping sleeve and valve within the County ROW to provide water to the onsite truck washes at 1701 N. Hercules Ave, Clearwater, FL 33765. The construction of the water main will be installed via open-cut methods. A permit application has been submitted to the FDEP for applicable portions of this project. Construction is scheduled to begin 01/01/2026 and will be completed by 12/31/2026.

GC Bidding

$5,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
262
Active Projects
49
Bidding Soon
1,947
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.