Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 21, 2026 at 8:00 PM

Updated July 27, 2026

Site work and new construction of an educational facility in Addison, Alabama. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Construction of a new field house facility. The Work of Project is defined by the Contract Documents and consists of the following: A wood framed, brick and metal siding structure for concessions and visitor's dressing area Bonds: 5% Bid Bond, Certified Check required, Performance Bond required (unspecified amount), Payment Bond required (unspecified amount). Any questions concerning the pre-bid conference shall be directed to the Architect

Post-Bid

$3,000,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
56
Bidding Soon
1,045
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2026

August 17, 2026

Project location map

151 SCHOOL DRIVE, Addison, AL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed