Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 6, 2026 at 8:00 PM
Updated July 9, 2026
Site work and renovation of a conference / convention center in Fredericksburg, Texas. Completed plans call for the renovation of a conference / convention center; and for site work for a conference / convention center.
Public restroom renovations and carpet replacement. The project includes renovation of public restroom facilities (approximately 500 s.f.) at the Fredericksburg Visitor Information Center which will consist of replacing all interior finishes, plumbing fixtures, light fixtures, and toilet partitions with new fixtures and finishes as specified. The exterior drinking fountains will be replaced. Electronic access control hardware will be installed on restroom entrances. Plumbing and electrical infrastructure in the plumbing chase in between the restrooms will be reconfigured for easier access and maintenance. Lastly, existing carpet in the CVB Offices and Theater will be replaced with new carpet (approximately 4,900 s.f.). The Construction Manager-at-Risk ("CMAR") will serve as the City's construction partner during both the design and construction phases of the project. During design, the CMAR will provide preconstruction services including cost estimating, constructability review, scheduling, value engineering, and budget guidance to assist the Owner and Architect in developing a project that aligns with the City's budget and schedule objectives. Prior to commencement of construction, the CMAR will provide competitive bids from subcontractors and work collaboratively with the Owner and Architect to develop and negotiate a Guaranteed Maximum Price ("GMP") for review and acceptance by the Owner. During construction, the CMAR will act as the general contractor to coordinate and supervise the Work, maintain project safety, manage construction scheduling, and assume responsibility for delivering the project within the agreed GMP, subject to adjustments authorized by the Contract Documents. Estimated Construction Cost: Less than $400,000 Estimated Start of Construction: October 2026 Estimated Construction Duration: 4 months
GC Bidding
$400,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
302 E Austin St, Fredericksburg, TX
Related To This Project
Fredericksburg, TX
--
Fredericksburg, TX
Bid Date: Jun 09 2026
Fredericksburg, TX
--
Fredericksburg, TX
--
Fredericksburg, TX
Bid Date: May 20 2026
Fredericksburg, TX
--
Fredericksburg, TX
--
Fredericksburg, TX
--
Fredericksburg, TX
--
Fredericksburg, TX
--
Fredericksburg, TX
--
Fredericksburg, TX
--
Fredericksburg, TX
--
Fredericksburg, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
