BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 3, 2026 at 8:00 PM

Updated July 11, 2026

Site work and new construction of a fire / police facility in Friday Harbor, Washington. Design plans call for the construction of a one-story above grade fire / police facility; and for site work for a fire / police facility.

REQUEST FOR PROPOSALS (RFP) Engineering Services Stuart Island Fire Station Project San Juan County Fire Protection District No. 3 1. Introduction San Juan County Fire Protection District No. 3 ("District") is soliciting Statements of Qualifications and Proposals from qualified engineering firms, pursuant to RCW 39.80, to provide professional engineering services for the review, verification, and approval support of the Stuart Island Fire Station project. The project has been architecturally designed by Perkins & Will in collaboration with McLennan Design. 2. Project Overview The proposed project includes a single-bay apparatus garage with a single-pitch roof structure, multiple vehicle and personnel access doors, a concrete slab foundation, and minimal infrastructure systems including rainwater catchment cisterns, propane heat-ing, and a small solar photovoltaic array. The site is located in a remote island environment with limited utilities. 3. Scope of Services The selected firm will perform design review and validation, engineering analysis, code compliance ver-ification, coordination with project stakeholders, and preparation of deliverables including reports, marked-up plans, and stamped documents if required. 4. Minimum Qualifications Firms must be licensed in Washington State and demonstrate experience with remote or rural infrastructure, public safety facilities, and relevant building systems. 5. Selection Process Selection will follow RCW 39.80 Qualifications-Based Selection procedures, including evaluation, ranking, and potential interviews prior to fee negotiation. 6. Submission Requirements Submissions shall include a cover letter, statement of qualifications, key personnel, relevant experience, proposed scope, fee structure, and references. The method of Contractor Selection has not been Determined at this time. "Requests for proposals for design services is underway."

Design

$3,000,000.00

Public - County

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

To Be Determined, Friday Harbor, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.