BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 14, 2026 at 8:00 PM

Updated August 20, 2026

Site work and new construction of a bridge / tunnel in Taylors, South Carolina. Completed plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

Fabrication and installation of bridge railings for the Swamp Rabbit Trail crossing in Greenville, SC. Question Deadline 07/21/2026 at 2:00 PM ET All inquiries regarding this proposal shall be submitted online. General Requirements All work shall be performed by certified welders employed by a licensed contractor. All welders shall hold a current AWS D1.1 certification at minimum and shall have an approved Welding Procedure Specification (WPS) on file for each weld type performed on this project. o Proposers shall include proof of a valid, active SC contractor's license with their submission. o All steel shall be weathering steel conforming to ASTM A588 or ASTM A847, similar or equal to U.S. Steel COR-TEN(R) Vertical Posts o Vertical posts shall be HSS 3" x 3" x 3/16" square hollow structural section conforming to ASTM A500, fabricated from weathering steel. o o Posts shall be attached to the base plate with full-length fillet welds on both sides of the tube. Vertical posts shall be spaced no more than 6'-0" on center. Top Rail o The top rail shall be HSS 6" x 4 " x 3/16" rectangular hollow structural section welded to the vertical posts. Horizontal Rail Infill -- AASHTO Requirements Horizontal rail members shall be spaced to comply with AASHTO bridge railing requirements, including: - Rail height shall be a minimum of 48" above the walking surface. - A 6" diameter sphere shall not pass through any opening within the bottom 27" of the railing system . An 8" diameter sphere shall not pass through any opening above 27". Flared End Sections o Flared end sections shall be installed at a 45-degree angle at all four (4) bridge corners, extending a minimum of 5'-0" beyond the edge of pavement. o Each flared section shall be fitted with a Swamp Rabbit Trail logo panel cut from 1/4" weathering steel (ASTM A588), mounted to cover the face of the angled segment. o Logo fabrication is the responsibility of the contractor. The logo shall match the existing installation at Little Creek Pedestrian Bridge. Contractor shall field-verify dimensions prior to fabrication

Award

$3,000,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
273
Active Projects
117
Bidding Soon
1,366
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2026

September 8, 2026

Project location map

Multiple Locations, Taylors, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.