Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 21, 2026 at 8:00 PM
Updated July 27, 2026
Site work for a water / sewer project in Montreal, Quebec. Completed plans call for site work for a water / sewer project.
Reference number: 20157043 Deadline for receipt of complaints 2026-07-20 This contract includes, but is not limited to, the performance of the following remedial works: Item 3 - Retaining wall Repair of cracks in the retaining wall, including any necessary earthworks, temporary shoring works, structural repairs in accordance with the professional's plans, and verification of watertightness following completion of the works. Item 5 - Render Refurbishment of the render on the retaining wall, including surface preparation, the application of new render suitable for external use, and the restoration of the surfaces. Item 10 - Gutters Repair of sections of guttering with defects, adjustment of slopes to ensure adequate drainage, and cleaning of the affected masonry surfaces. Item 12 - Wall of the ramp leading to the garage Repair of the render finish to achieve a uniform, durable finish consistent with the existing work. The contractor is responsible for providing a turnkey contract, including in particular: Full coordination of the works and subcontractors; The provision of all necessary labour, materials, equipment and fittings; The protection of existing structures and the maintenance of a clean and safe site; Implementing and complying with applicable health and safety measures; Obtaining the necessary permits, authorisations and approvals for the works, where applicable; Coordinating with the professional and the client's representative; The works must be planned in such a way as to ensure their continuous and efficient completion. All works must be completed, inspected and handed over by 1 November 2026 at the latest. The contractor must provide a detailed schedule before work commences and must notify the client without delay of any event that may affect compliance with this completion date. Delivery schedule Between 1 September 2026 and 1 November 2026. Restoring the site to its original condition upon completion of the works; Carrying out the works in accordance with the contractual documents, best practice and the recommendations of professionals. Reference number: 20157043 Deadline for receipt of complaints 2026-07-20 There is provision for a tendering process for each tender No Electronic tender submission accepted Yes, via SEAO, with a document Estimated contract price range 139 000 $ à 347 399 $ Expected duration of the contract without options (in months) 3 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
$347,399.00
Public - State/Provincial
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 10, 2026
September 1, 2026
Multiple Locations, Montreal, QC
Related To This Project
Montreal, QC
--
Montreal, QC
Bid Date: Jul 27 2026
Montreal, QC
Bid Date: Jul 17 2026
Montreal, QC
Bid Date: Jul 17 2026
Montreal, QC
--
Montreal, QC
Bid Date: Aug 10 2026
Montreal, QC
--
Montreal, QC
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
