Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 25, 2026 at 8:00 PM
Updated October 1, 2026
Site work and renovation of an educational facility in East Pineville, Kentucky. Completed plans call for the renovation of a 87,454-square-foot educational facility; and for site work for a educational facility.
The Contractor shall present a correct account of all items comprising the net cost of such Work. The cost shall include the cost to the Contractor of all materials used, of all labor including common and skilled, foremen, and trucks and teams, and the fair rental of all machinery used and for the period of such use. If such Work requires the use of machinery not already upon the Work or to be otherwise used upon the Work, then the cost of transportation of such machinery to and from the Work shall be added to the fair rental, but said transportation shall not cover a distance exceeding one hundred (100) miles. The Contractor shall include an amount not to exceed ten percent (10%) of the net cost of the change for overhead. The Contractor shall include an amount not to exceed five percent (5%) of the net cost of the change for profit. The Contractor shall only receive one fifteen percent (15%) markup as the "jobsite overhead and profit" component whether such work is done by the Contractor or by his Subcontractor. The Contractor shall not include in the net cost of Work any cost or rental for small tools, or any portion of time of the Contractor or his superintendent, or any allowance for the use of capital , or any additional bond premium, insurance cost applicable to the Work, or any actual or anticipated profit, or any job or office overhead not previously mentioned, as these are covered by the added fifteen percent ( 15%) for the jobsite overhead and profit component. Separate amounts shall be shown for each material item, labor item, overhead and profit. Questions Should Be Directed To The Construction Manager And The Architect. Craig Music Codell Construction Company 4475 Rockwell Road Winchester, Ky 40391 (859) 744-2222 (859) 478-8768 Cmusic@codellconstruction.com Jeanie Cannon Rbs Design Group, Psc 732 Harvard Drive Owensboro, Ky 42301 (270) 683-1158 Jeanie@rbsdesigngroup.com Full building renovation of Bell Central School Center including structural, mechanical, electrical, and plumbing systems. Bonds: 5% Bid Bond, 100% Performance Bond, 100% Payment Bond.
Under Construction
$1,500,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 6, 2026
September 17, 2026
9821 US-25E, East Pineville, KY
Related To This Project
East Pineville, KY
Bid Date: Aug 06 2026
East Pineville, KY
--
East Pineville, KY
--
East Pineville, KY
--
East Pineville, KY
Bid Date: Oct 27 2026
East Pineville, KY
Bid Date: Oct 22 2026
East Pineville, KY
Bid Date: Nov 05 2026
East Pineville, KY
Bid Date: Aug 28 2026
East Pineville, KY
Bid Date: Jul 21 2026
East Pineville, KY
Bid Date: Nov 19 2025
East Pineville, KY
Bid Date: Oct 07 2025
East Pineville, KY
Bid Date: Sep 25 2025
East Pineville, KY
Bid Date: Sep 16 2025
East Pineville, KY
Bid Date: Sep 03 2025
East Pineville, KY
Bid Date: Jul 24 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed