Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 25, 2026 at 8:00 PM

Updated October 1, 2026

Site work and renovation of an educational facility in East Pineville, Kentucky. Completed plans call for the renovation of a 87,454-square-foot educational facility; and for site work for a educational facility.

The Contractor shall present a correct account of all items comprising the net cost of such Work. The cost shall include the cost to the Contractor of all materials used, of all labor including common and skilled, foremen, and trucks and teams, and the fair rental of all machinery used and for the period of such use. If such Work requires the use of machinery not already upon the Work or to be otherwise used upon the Work, then the cost of transportation of such machinery to and from the Work shall be added to the fair rental, but said transportation shall not cover a distance exceeding one hundred (100) miles. The Contractor shall include an amount not to exceed ten percent (10%) of the net cost of the change for overhead. The Contractor shall include an amount not to exceed five percent (5%) of the net cost of the change for profit. The Contractor shall only receive one fifteen percent (15%) markup as the "jobsite overhead and profit" component whether such work is done by the Contractor or by his Subcontractor. The Contractor shall not include in the net cost of Work any cost or rental for small tools, or any portion of time of the Contractor or his superintendent, or any allowance for the use of capital , or any additional bond premium, insurance cost applicable to the Work, or any actual or anticipated profit, or any job or office overhead not previously mentioned, as these are covered by the added fifteen percent ( 15%) for the jobsite overhead and profit component. Separate amounts shall be shown for each material item, labor item, overhead and profit. Questions Should Be Directed To The Construction Manager And The Architect. Craig Music Codell Construction Company 4475 Rockwell Road Winchester, Ky 40391 (859) 744-2222 (859) 478-8768 Cmusic@codellconstruction.com Jeanie Cannon Rbs Design Group, Psc 732 Harvard Drive Owensboro, Ky 42301 (270) 683-1158 Jeanie@rbsdesigngroup.com Full building renovation of Bell Central School Center including structural, mechanical, electrical, and plumbing systems. Bonds: 5% Bid Bond, 100% Performance Bond, 100% Payment Bond.

Under Construction

$1,500,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
74
Bidding Soon
1,195
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2026

September 17, 2026

Project location map

9821 US-25E, East Pineville, KY

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed