BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 9, 2026 at 8:00 PM

Updated September 15, 2026

Demolition, site work, paving and new construction of a civil project in Bloomfield Hills, Michigan. Completed plans call for site work for a road / highway; water / sewer project; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; and for paving for a bridge / tunnel.

0.08 mi of bridge reconstruction including replacement with a prestressed concrete box culvert, drainage, watermain, sanitary sewer, guardrail, signing, pavement markings and approach work on M-1 over Stoney Croft Drain in the city of Bloomfield Hills, Oakland County. 0% Sbp Participation Required All inquiries concerning the plans and proposal for this project are to be directed to: Charles Occhiuto Project Manager MDOT-eProposal@Michigan.gov To be able to process and distribute an addendum, if required , all inquiries shall be made at least seven (7) calendar days before the letting. Net classification required for this project is 5032 Ea or 5032 Fa In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Ea and Fa. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. MIDOT - 2608 001 - Bridge Reconstruction Including Replacement With a Prestressed Concrete Box Culvert, Drainage, Watermain, Sanitary Sewer, Guardrail on M-1

Award

$4,846,800.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
375
Active Projects
167
Bidding Soon
2,448
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2026

October 6, 2026

Project location map

M-1, Bloomfield Hills, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.