BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 9, 2026 at 8:00 PM

Updated July 11, 2026

Site work and paving for a civil project in Newport, Oregon. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Region 3 US20: Harney St. / Moore Dr. (Newport) Project Corvallis - Newport Highway Steve Schultz, RE US20: Harney St./Moore Dr. (Newport) Project on the Corvallis-Newport Highway (Rt. No. US20) in Newport. FAP No. S033(067). ($ 2,000,000 - $ 5,000,000). Req. approx. 890 ft2 temp. signs; 1 ea seq. arr. signs; 4 ea PCMS; 500 hrs flag.; 4 ea flag. sta. light.; 14,138 ft temp. striping; 2 ea TMA; 1 ea temp. traff. sig.; 200 ft PCD; 2 ea temp. curb ramp; 250 ft2 temp. walks; 610 yd2 mat.; 3,100 yd2 comp. eros. blnkt.; 27 ea ck. dam; 11 ea inlet prot.; 822 ft sed. barr.; const. surv. wrk.; 2,110 ft asph. pvmt. sawcut.; 1,425 yd3 emb.; 2,230 yd3 st. emb.; 200 yd2 geot.; 41 yd3 riprap; 1,100 ft vid. insp.; 809 ft pipe; 5 ea sl. end sect.; 23 yd3 conc. in blk.; 127 ft2 pav. culv. end sl.; 10 ea conc. M.H.; 4 ea conc. inlets; 9,800 yd2 CPPR; 1,450 ton aggr. base; 2,070 ton ACP; 1,595 ft conc. curbs; 5,200 ft2 conc. walks; 500 ft2 conc. surf.; 96 ft2 trunc. domes; 775 ft gd. rl.; 32 ea delin.; 13,500 ft. thermo. striping; rem. & reinstall. extg. signs; 260 fbm wood sign post; 1.44 yd3 conc. in sign sup.; 1,825 lb st. in sign sup.; 302 ft2 signs; 105 ft sig. sup. drl. shft.; 1 ea traf. sig. install.; 2 ea wtr. qual. biofil.; 0.65 acre perm. seeding; 263 yd2 lawn seeding. Completion Time: October 29, 2027. Classes of Work: either A) Earthwork and Drainage, or B) the combination of any two classes in the following list: Asphalt Concrete Paving and Oiling, Electrical, or Miscellaneous Highway Appurtenances. This Project Contains Fuel Escalation Clause. Project Manager: Steve Schultz, Email: Steven.schultz@odot.oregon.gov The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT's Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project's special provisions, and the bid booklet. ORDOT - 003 - US20: Harney St. / Moore Dr. (Newport) Project *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

$5,000,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
10
Bidding Soon
1,024
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.