BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2026 at 8:00 PM

Updated August 2, 2026

Demolition, site work, new construction and renovation of a playground / park / athletic field in Garden City, Kansas. Completed plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; for the demolition of a playground / park / athletic field; and for the renovation of a playground / park / athletic field.

Design and construction of three turnkey metal concession and restroom buildings at Frederick Finnup Park. Scope includes metal building fabrication, structural assembly, plumbing, electrical, and interior finishes for restrooms, concession areas, ticket windows, and storage facilities. Deadline for Questions July 10, 2026 RFP questions should be emailed to Ticia Herd Scope of Work A. Clint Lightner Field Concession, Restrooms, and Ticket Booth i. The work involves the design , fabrication, delivery, and turnkey construction of a 270 x 320 x 108 metal building with a concrete pad foundation. The structure must accommodate an adequate concession space with storage, a ticket booth, and two restrooms, one mens and one womens. B. Fansler and Cleaver Fields Concession and Restrooms i. The work involves design, fabrication, delivery, and turnkey construction of two 240 x 240 x 9 8 metal buildings with concrete pad foundations. The structure must accommodate an adequate concession space with storage and two restrooms, one men's and one women's. These buildings can be the same design Description: The City of Garden City Parks and Recreation Department is seeking proposals from qualified metal building contractors to design and construct a turnkey concession and restroom building for each of three baseball diamonds at Frederick Finnup Park. Clint Lightner's restrooms and concession building should be larger than the other two structures and also include a ticket booth window and additional storage. The restrooms at Clint Lightner Field, Fansler Field, and Cleaver Field have the same architecture and appear to have been built around the same time period The new metal facilities should be constructed of durable building materials and are intended to provide modern restroom accommodations, functional concession service areas, adequate storage, and an efficient layout capable of supporting attendance during league play and tournament events. The Department is seeking a cost-effective, durable, and low-maintenance solution that will serve the community for many years. To view the full bid packet please visit: Baseball Field Concession and Restroom Building

Post-Bid

$3,000,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
4
Bidding Soon
57
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2026

September 1, 2026

Project location map

301 S 4th St, Garden City, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.