BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 29, 2026 at 8:00 PM

Updated August 5, 2026

Site work and renovation of a water / sewer project in Houston, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Question Deadline 07/20/2026 at 2:00 PM CT Questions regarding this RFQ or the project may be submitted in writing via Online. The location of the project will be at the same location as the current water plant (3825 Milton St. West University Place, TX 77005). The project includes constructing proposed water plant improvements, including two (2) packages as noted below. Please also reference Exhibit E - RFQ Package Plan for additional information. Package 1 Temporary controls for the water plant to run off the existing pump building and 0.4 MG GST during the construction duration Demolition of the existing 1.5 million gallon (MG) ground storage tank (GST) Construction of new 80-ft diameter 2.0 MG dual-chamber GST w/ associated piping and sitework Package 2 Demolition of existing I.T. , Public Works Storage/Garage buildings, and underground fuel tanks Single story pump building approximately 1,125 square feet (sf) Two story electrical building approximately 700 sf Permanent Liquid Ammonium Sulfate (LAS) and Chlorine (CL2) chemical storage, disinfection systems, and buildings Proposed surface water control station including piping, valves, and vault Water plant yard piping Proposed electrical power service including pad mounted electrical transformer Proposed emergency power generator Proposed SCADA Final sitework including proposed access drive and fencing Demolition of existing pump building and 0.4 MG GST once construction and testing of new facilities is complete The estimated construction cost is $ 19,660,000 Preconstruction and construction services for the Milton Street Water Plant Improvement project, involving team coordination with City staff and Design Professionals for design and construction delivery. Question Deadline 07/20/2026 at 2:00 PM CT

Post-Bid

$19,660,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
447
Active Projects
203
Bidding Soon
3,695
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2026

September 29, 2026

Project location map

3825 Milton St, Houston, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.