Published July 8, 2026 at 8:00 PM

Updated July 10, 2026

Renovation of a military facility in Bremerton, Washington. Completed plans call for the renovation of a military facility.

This project will design and install HVAC and fire protection systems for pumpwell 4, a below-ground facility. The primary function of the HVAC system will be to provide air exchange and maintain humidity levels within the pumpwell at all times and provide sufficient outdoor air for cooling during drydock dewatering when the pump motors and electrical equipment generate significant heat. A fire protection system with a fire alarm, sprinkler system, and smoke exhaust will be installed as well. This project includes the following work. 2.2.1 Demolish existing HVAC system 2.2.2 Install new HVAC system. The system shall meet the following performance requirements: 2.2.2.1 Maintain a maximum 55 degree dewpoint throughout the facility at all times except during dewatering events. 2.2.2.2 Circulate air throughout the facility. Circulating fans shall be installed to distribute dehumidified air throughout the facility during normal operations. A minimum of 12 fans with a minimum combined airflow of 50,000 cfm will be distributed optimally to circulate air in the area containing the main dewatering motors and pumps, as well as the drainage pumps. 2.2.2.3 Capability for manual or thermostatic controls during normal operations for utilization of outdoor air for cooling 2.2.2.4 Design for a maximum 104 degrees ambient temperature for electrical equipment during dewatering operations. 2.2.2.5 Provide a minimum 30,000 cfm outdoor air to the interior of the facility. 2.2.2.6 Provide cooling air to the underside of the pump motors. Forced airflow shall be a minimum of 15,000 cfm distributed equally to the three pump motors. 2.2.2.7 Provide cooling air to the electrical equipment. Forced airflow shall be a minimum of 15,000 cfm 2.2.2.8 Provide cooling air for occupant comfort 2.2.3 Install fire safety system. PID N44255-26-RFPREQ-NBK ROICC-0250 FAR 36.204 Disclosure of the Magnitude of Construction projects: Between $1,000,000 and $5,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PPIs shall be submitted via email to emily.c.fogg2.civ@us.navy.mil with a copy to Jason.a.lewis34.civ@us.navy.mil. PPIs will be accepted up to five business days following the site visit. Question Deadline 07/22/2026

GC Bidding

$5,000,000.00

Public - Federal

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
22
Bidding Soon
2,054
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

To Be Determined, Bremerton, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.