BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 23, 2026 at 8:00 PM

Updated August 1, 2026

Renovation of a residential development in San Antonio, Texas. Completed plans call for the renovation of a residential development.

Housing Authority of the City of San Antonio a/k/a Opportunity Home San Antonio (Opportunity Home) and its affiliated entities hereby invites qualified independent Contractors to submit bids for labor, materials and equipment to renovate the following units located in 313 Rosita, and 1115 San Fernando at Alazan/Apache courts, in San Antonio, TX 78207. These services are needed to preserve the asset and enhance the aesthetics of the property. Questions Due Date: Jul 20th 2026, 10:00 AM CDT Questions Online Portal Questions Online Portal - POINT OF CONTACT Christian Herrera, Sr. Contract Specialist Phone: (210) 477-6254 Fax: (210) 477-6254 christian_herrera@homesa.org NIGP Code # 906-38, 909-23 313 Rosita, San Antonio Texas:- I. Exterior Renovation o Cleaning: o Power wash all exterior concrete areas and walls. o Fixtures & Hardware: o Install new wall-mount mailbox. o Install new Front porch wall-mount LED light fixture. o Install new Back porch Ceiling mount light fixture. o Rear Entry Door (Outside Water Heater Closet): Sand and paint the door. II. First Floor Renovation A. General Finishes o Walls: o Install 900 SF of drywall with orange peel texture. o Install furring channels as needed (related to walls/ceiling). o Ceiling: o Install 400 SF of drywall with orange peel texture. o Flooring: o Install 250 SF of VCT (Vinyl Composition Tile). o Install 168 LF of baseboard and quarter round. B. Entry o Main Entry Door: o Replace 36" x 64" metal security screen door. Install (1 ) passage knob and (1 ) entry deadbolt, keyed to the unit. o Sand and paint the main entry door. o Replace door viewer. o Replace door sweep and weatherstrip. C. Living Room Area o Electrical/Safety: Install ceiling light fixtures. o Install (1 ) Smoke alarm. o Install (1) Carbon Monoxide detector. o Windows: o Replace 5 window panels. o Install window ledge/stool/trim casing. o Install 3 mini blinds. o Closet: o Install (1 ) 24" x 80" 6-panel door with passage knob. Install ( 1) wall-mount light fixture. D. Dining Room o Electrical: Install ceiling light fixtures. E. Kitchen Area Cabinetry & Countertops: o Install 4 base cabinets and 6 wall cabinets with new countertops. o Prime and paint new cabinets. o Appliances/Ventilation: o Install 1 ea. 30-inch vent-a-hood. o Electrical & Lighting: o Install 1 ea. 4 ft. strip light. o Install insulation in the kitchen area (location/type to be specified). o Plumbing (Sink): o Install 1 ea. double sink. o Install 2 ea. basket strainer assemblies. o Install 1 ea. kitchen faucet. o Install 2 ea. supply lines and 2 ea. angle stops. o Install 1 set of drain pipes assembly. o Finishes: Install 1 ea. back splash panel behind the stove. o Windows: o Install window ledge/stool/trim casing. o Install 1 ea. 23" x 36" mini blind. F. Pantry Closet o Door: o Install 1 ea. 24" x 80" 6- panel door with passage knob. o Storage: Install 6 ea. closet shelves supported by 6 ea. metal galvanized steel studs (for shelf supports). G. Laundry Room o Walls/Ceiling: o Install furring channels as needed. Electrical/Plumbing: Install 1 ea . ceiling light fixture. o Install 1 ea. washer box with 2 cut-offs. o Install 1 dryer vent. o Storage: o Install 1 ea. wall cabinet. H. Rear Entry o Door: o Replace 36" x 64" metal security screen door. o Install (1 ) passage knob and (1 ) entry deadbolt, keyed to the unit. o Sand and paint the rear entry door. o Replace door viewer o Replace door sweep. o Replace passage knob (on main door, if separate from deadbolt/knob above). III. Stairs Renovation o Walls: o Install 90 SF of drywall. o Electrical: Install ceiling light fixtures. o Stair Structure: o Install stair risers and treads (wood). o Finishes: o Paint stairs and hand railings. IV. Second Floor Renovation A. General Finishes o Walls: o Install 600 SF of drywall. o Flooring: o Replace 275 SF of VCT. o Install 120 LF of baseboard and quarter round. B. Bathroom o Door: o Replace 1 ea. 30" x 80" 6-panel door with privacy knob. o Plumbing Fixtures: o Replace 1 vanity cabinet with sink. o Install new drain pipes. o Install new faucet and pop-up assembly. o Install 1 ea. complete commode. o Electrical: o Replace 1 wall light fixture. o Finishes/Accessories: o Re-grout flooring and shower walls. o Install 1 ea. soap dish. o Install 1 ea. toothbrush holder. o Install 1 ea. towel bar. o Walls: o Install drywall (scope to be defined, likely repair/patching related to other work). o Closet: o Replace 24" x 80" 6- panel door with passage knob. C. Bedroom #1 o Door: o Replace 32" x 80" 6-panel door with passage knob. o Electrical/Safety: o Install 1 ea. smoke detector. o Install 1 ea. ceiling light fixture. o Windows: Replace 1 window panel. o Install window ledge/stool/trim casing. o Flooring: o Replace VCT with new baseboard and quarter round. o Closet: o Install 24" x 80" 6-panel door with passage knob. D. Bedroom #2 o Door: o Install 32" x 80" 6-panel door with a passage knob. o Electrical/Safety: Install ceiling light fixtures. o Install smoke detectors. o Windows: o Install window ledge/stool/trim casing. o Flooring: o Replace VCT with new baseboard and quarter round. o Closet: o Replace 32" x 80" 6-panel door with passage knob. 1115 San Fernando, San Antonio Texas :- Objective: Restore exterior surfaces, improve security, and update lighting. o Power Washing: Deep clean front and back porches, including all walls and concrete ceilings. o Painting: Prep and paint all exterior railings (front and back). o Lighting: Install two (2) photocell-type porch lights (one front, one back). o Front & Rear Entry Doors (Duplicate Specs): o Screen Door: Install metal screen door with sweep, keyed entry knob, and smart-key deadbolt. o Main Door: Install solid entry door with sweep, viewer ( peephole), dome floor stop, keyed entry knob, and smart-key deadbolt. II. Interior General Finishes Objective: Uniform flooring and wall restoration throughout the unit. Flooring: Install +/- 665 SF of VCT (Vinyl Composition Tile). o Trim: Install +/- 200 LF of baseboard and quarter-round molding. o Paint: Prime and paint +/- 1,200 Sf interior walls and +/-700 Sf of ceilings. o Walls and ceiling to be in uniform. o Window Treatments: Install mini-blinds as specified in individual room sections. III. Mechanical, Plumbing (Licensed Required) Mechanical (Licensed HVAC Only) o 1st Floor: Remove existing wall furnace; install new 35,000 BTU gas furnace including new thermostat and wiring. o 2nd Floor: Remove wall furnace, cap gas lines, and convert the space into a pantry. Plumbing (Licensed Plumber Only) o Water Supply: Verify/install hot/cold lines for Kitchen, Laundry, Bathroom, and a water heater. o Water Heater: Install a new 30-gallon water heater with all necessary piping. o Fixtures: Install all sinks, faucets, stops, and drainage as listed in room-specific sections. Electrical o Logic Change: Direct-wire porch lights to eliminate the 3rd switch in the Living Room and Kitchen circuits. IV. Room-Specific Details Living Room Electrical: ( 1 ) Ceiling fixture, ( 1 ) cable jack, (1 ) blank plate. Safety: (1 ) Battery smoke alarm , (1 ) Carbon Monoxide (CO) detector. o Walls/Windows: Repair 40 SF of cinder block wall; install (2) mini-blinds. Kitchen & Laundry o Laundry: Repair 4x4 concrete floor; install washer box with bibbs, (1 ) wall light. o Kitchen Cabinetry: Install (5) base cabinets, (5) wall cabinets, and (3) countertops with end caps. Kitchen Fixtures: Double-bowl drop-in sink, single- handle faucet, 30-inch vent-a-hood, back splash and 4ft fluorescent light. Install angel stops, supply lines, basket strainers, drain piping. o Kitchen Construction: Repair 109 SF cinder block walls and 32 SF ceiling (add insulation). Bathroom o Fixtures: Install Sloan toilet, new bathtub, vanity with lavatory sink, Angel stops, supply lines, pop up assembly,drain lines and medicine cabinet. o Tile: Remove and replace 55 SF of ceramic tile and install new o Electrical: Replace (1 ) ceiling light. o Hardware: Install shower rod, head, towel bar, soap dish, and tissue holder. o Door 36x82 with privacy knob Bedrooms (1 & 2) o Doors: 32x80 entry doors with passage knobs. o Storage: Install closet shelf and rod in both rooms. o Safety: Smoke alarms in each room. o Repairs: 2x3 wall patches in each room. Stairs & Hallway o Safety: Install Smoke alarms and CO detector in the hallway. o Electrical: Replace ceiling light fixtures V. Specialized Closets o Water Heater Closet: Install 24x80 door with one-sided keyed deadbolt; install +/- 80 SF of drywall with texture. o 2nd Floor Pantry: (Converted from furnace area) Finish walls and flooring to match the interior. Install 4 shelves. Intent to Bid by Jul 28, 2026 2:00 PM CDT.

Post-Bid

$120,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
253
Active Projects
96
Bidding Soon
2,600
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2026

August 27, 2026

Project location map

Multiple Locations, San Antonio, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.