BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 8, 2026 at 8:00 PM

Updated July 10, 2026

Site work for a power facility in Riverside, California. Completed plans call for site work for a power facility.

Installation of one (1) vault, two (2) padmounted switch enclosure (PSE), three (3) padmounted junction cabinets (PJC), and slab boxes, approximately 657 trench feet of conduit, furnish and install approximately 284 linear feet of 4-inch SCH40, 2359 linear feet of 4-inch S40E conduit, and 1,040 linear feet of 5-inch S40E conduit, and three (9) protective barriers. Scope also includes asphalt paving and core drill structures, remove and replace concrete.

GC Bidding

$1,415,145.00

Public - City

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
584
Active Projects
42
Bidding Soon
3,923
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

3900 Main Street, 6th Floor, Riverside, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.