Renovation of a military facility in Edinburg, Texas. Completed plans call for the renovation of a military facility.

PLEASE NOTE: No award has been made. The program has been evaluating the submissions, and we just learned that there may be an extended hold on making an award. The reason for this is that the program is considering making an alteration to the building first, before executing the sprinkler installation. A decision is expected by Wednesday, 9/9. If it's decided that no alteration will be made, then we'll likely make an award by the end of next week, 9/11. If it's decided that they are going ahead with this particular alteration, then we would have to put the sprinkler project on an indefinite hold. This would be by amendment. Due to a recent fire in Building 6418, a wet fire suppression system is required for the facility, which was constructed in the early 1980s without an existing fire suppression system. The contractor shall provide a complete turnkey solution, including design and as-built drawing submittals, and the installation of a new retrofitted fire suppression system. The project shall encompass all labor, materials, equipment, and services necessary to deliver a fully functional fire suppression system. This amendment also incorporates the floor plan (next page ) . The highlighted area has a plywood ceiling that will require a sprinkler in the attic space, positioned above the hard lid and below it. Additionally, much of the facility has new ceiling grid and tile. Some parts of the facility have older tile. The contractor must document as -built conditions and is responsible to return to as installed , including re-installing the tile. Submit questions to james.g.roloff@usda.gov no later than July 31, 2026, at non CT. This will ensure there will be enough time to respond before the solicitation period ends. Please include the solicitation name and number in the subject line of the email. The estimated magnitude of this project is between $100,000 and $500,000. Amendment 1 is posted below. RFI: Does Building 6418 currently have an existing fire alarm panel/system that the sprinkler monitoring would tie into If so, could you please provide the panel/system type, make/model, or any available details needed for a sprinkler monitoring quote The fire panels are old and obsolete. They will be replaced at another time, but the new sprinkler system must be able to connect to a fire panel in the future. No monitoring is needed. Question Deadline 07/31/2026 at 12:00 PM CT *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

$4,000,000.00

Public - Federal

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
35
Bidding Soon
533
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.