BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 11, 2026 at 8:00 PM

Updated July 12, 2026

Renovation of a military facility in Edinburg, Texas. Completed plans call for the renovation of a military facility.

A wet fire suppression system is needed for building 6418 at Moore Air Base, Texas, which was built in the early 1980s without fire suppression. Contractor shall provide design/as-built drawings submittals and install a new retrofitted system. The project requires a turnkey solution covering all necessary work to deliver a fully functioning fire suppression system. Contractor shall provide Design/As-Built drawings submittals and installation for a new retrofitted system starting at a flange one foot above the floor in building 6418. The system shall be a turnkey project encompassing everything needed to have a fully functioning fire suppression system. The contractor shall remove and dispose of all construction materials and debris off base. 4.1 Specifications: 1. Design and installation of the underground fire line including tap, piv, and above ground backflow preventer including testing certification, and riser room. 2. Design and installation of the turnkey automatic sprinkler system including canopy protection, sprinkler heads centered in ceiling tiles utilizing flex drops. 3. Submittal and approval to and from the authority having jurisdiction. 4. Fabrication and installation of the underground and overhead automatic sprinkler system including all permits, labor, materials and equipment needed for installation 5. All labor and equipment shall have a one-year warranty commencing on substantial completion date. 6. Design densities shall be in accordance with NFPA Standards. The Contractor shall ensure that all solutions/products shall be used in strict conformance with the product's Environmental Protection Agency (EPA) and state requirements. All manufacturers' instructions and recommendations for the use of the solutions shall be strictly followed. In addition, the contractor shall comply with all federal, state, or local laws and regulations concerning the use, storage, and disposal of hazardous materials. Contractor will provide Material Safety Data Sheets as specified in this contract and keep the sheets current for any product that is used in this contract. Contractors must comply with applicable codes, environmental regulations in the State of Texas and local ordinances. All work shall be performed in accordance with all applicable State and Local codes and standards. All work to be executed in a professional , workman like manner. All equipment and material installed on this project shall be new and unused unless otherwise noted. All work to be performed during normal business hours, Monday through Friday, unless otherwise noted. Submit questions to james.g.roloff@usda.gov no later than July 31, 2026, at non CT. This will ensure there will be enough time to respond before the solicitation period ends. Please include the solicitation name and number in the subject line of the email. 1. The estimated magnitude of this project is between $100,000 and $500,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Sub-Bidding

$500,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
8
Bidding Soon
648
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.