BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 10, 2026 at 8:00 PM

Updated July 12, 2026

Renovation of a military facility in Pineville, Louisiana. Completed plans call for the renovation of a military facility.

Furnish all labor, supervision, materials, equipment, transportation, permits, testing, programming, startup, owner training, warranties, removal and disposal of existing equipment, surge protection, electrical connections, commissioning, and all incidentals necessary to replace the existing automatic slide gate operator and associated safety devices, restore the system to full operation, and provide a complete, tested, and fully functional automatic slide gate system in accordance with this Statement of Work. The Contractor shall furnish all labor, supervision, materials, equipment, tools, transportation, permits, testing equipment, disposal services, and incidentals necessary to remove the existing gate operating equipment and install a complete, fully operational automatic slide gate system. Work shall include, but is not be limited to, the following: 1. Removal of Existing Equipment o The Contractor shall: a. Coordinate work with the Contracting Officer's Representative (COR). b. De-energize the existing gate operator in accordance with applicable safety requirements. c. Disconnect and remove the existing automatic gate operator. d. Remove the existing controller and associated damaged components. e. Remove damaged photoelectric safety devices and safety edge devices as required. f. Remove damaged mounting hardware and miscellaneous accessories as necessary. g. Dispose of removed materials off Government property in accordance with applicable regulations unless otherwise directed by the COR. 2. Gate Operator Installation The Contractor shall furnish and install one (1) new commercial-grade automatic slide gate operator. The replacement operator shall: a. Be new and unused. b. Be designed for continuous-duty commercial operation. c. Be compatible with the existing slide gate. d. Meet or exceed the operating capacity of the existing system. e. Include all components necessary for complete operation. Installation shall include: f. Mounting the operator. g. Installing all required hardware. h. Connecting the drive chain. i. Adjusting chain tension. j. Programming controller settings. k. Adjusting travel limits. 1. Verifying smooth gate operation. Equivalent equipment meeting or exceeding these requirements may be provided. Questions shall be submitted via email to Jon.Smith@usda.gov and are due no later than November 15, 2025, at 12:00 PM Pacific Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the ema

Sub-Bidding

$10,000,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
5
Bidding Soon
523
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.