BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 10, 2026 at 8:00 PM

Updated July 16, 2026

Site work and paving for a road / highway in Walker, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This work consists of providing all labor, equipment, and materials necessary to construct an aggregate base from the existing hot mix asphalt (HMA) pavement, aggregate base course, and widened shoulders. The work includes pulverizing the existing HMA thickness regardless of any variation in depth and into the underlying aggregate to a depth of 2 inches. Also includes grading the pulverized material to the proposed grades, thickness and compaction as shown on the plans or as directed by the Engineer. Road improvement project consisting of road work between Division Ave and Eastern Ave. Bonds: 5% Bid Bond, 100% Payment Bond, 100% Performance Bond.

GC Bidding

$6,000,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
1
Bidding Soon
1,084
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

Multiple Locations, Walker, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.