BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 21, 2026 at 8:00 PM

Updated July 26, 2026

Site work for a civil project in Bourne, Massachusetts. Completed plans call for site work for a road / highway; and water / sewer project.

The work consists of regrading an area of approximately 12,500 square feet immediately to the east and north of the existing Black Pond Well Pump Station. The work also consists of regrading the existing access road (gravel) to level off low spots and re-establish a clear width of 12 feet along its entire length (approximately 450 feet). Dense graded crushed stone shall be placed along the regraded access road as specified and as shown on the drawings. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Docs notes; A hard copy of the Contract Documents may be obtained upon the deposit of $50.00 (refundable) by check or money order made payable to Comprehensive Environmental Inc. Contract Documents will be mailed to prospective bidders upon receipt of a separate check or money order for $35.00 (non-refundable) made payable to Comprehensive Environmental Inc. Question Deadline 07/17/2026 Technical questions shall be directed to Curt Busto at cbusto@ceiengineers.com To receive consideration, such questions shall be submitted in writing to the Engineer at least seven days before the established date for receipt of Bids.

Post-Bid

$100,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
609
Active Projects
171
Bidding Soon
3,945
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2026

August 21, 2026

Project location map

Black Pond Road, Bourne, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.