BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 20, 2026 at 8:00 PM

Updated August 4, 2026

Site work for a water / sewer project in St. Albert, Alberta. Completed plans call for site work for a water / sewer project.

Surface drainage improvements to Overton Place and Oakridge Drive to improve overall function and long-term performance. Documents can be obtained from https://stalbert.bidsandtenders.ca/ Question Deadline 07/21/2026 at 2:00 PM MT Questions related to this RFP are to be submitted through the bidding system only by clicking on the "Submit a Question" button for this specific opportunity Construction Completion (All Schedules): Substantial Completion - September 26, 2026. Construction Completion - October 3, 2026. Activities can include: o Construction, or maintenance/repair on City equipment o Earth Works o Road Works oLandscaping, playground and/or grounds work and maintenance oUtility installation, construction and repair oBuilding construction, repair and maintenance oBridge construction, repair and rehabilitation oConcrete and asphalt repair and maintenance o Storm water pond construction and maintenance o Building restoration or renovation including roof work and/or mechanical installation/maintenance. The Work for removal and replacement of existing wood fence as indicated on the Drawings, including all labour, equipment, and materials required to complete the Work as indicated in the Drawings, including removal and disposal of existing fence materials, demolition and removal of existing posts and foundations, excavation, subgrade preparation, supply and installation of new posts, rails, boards, caps, braces, concrete foundations, hardware, staining, alignment and leveling of fence sections, restoration of disturbed areas, cleanup, and all required submittals. Existing fence along Vintage Oakmont shall be reviewed and assessed in the field by the Contractor, Consultant, and City Representative prior to commencement of Work to identify fence sections exhibiting signs of leaning, displacement, movement, deterioration, or structural failure. Contractor shall remove and replace all identified fence sections to match existing adjacent fence conditions, materials, dimensions, and details, to the satisfaction of the Consultant and City Representative. All costs associated with fence assessment, removal , disposal , replacement, coordination, restoration of disturbed areas, and all incidental work required to complete the Work shall be considered incidental to the Contract, and no additional payment will be made.

Post-Bid

$500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
32
Bidding Soon
593
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2026

September 1, 2026

Project location map

Multiple Locations, St. Albert, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.