BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 10, 2026 at 8:00 PM

Updated July 11, 2026

Site work and paving for a sidewalk / parking lot in Northbrook, Illinois. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Village of Northbrook systematically surveys public sidewalks to identify defective and deteriorated sections that create a potential hazard. A number of factors, including tree roots pushing up sections of sidewalk and the Midwest's freeze/thaw cycle, cause defective and deteriorated sections of sidewalk. In the Bicycle and Pedestrian Plan, sidewalk maintenance was identified as a key component of network connectivity for pedestrians. Replacement Process: oVillage staff survey sidewalks based on logical geographic areas (such as the one depicted in the map on the next page) to determine which portions are to be replaced. oIn addition to the replacement of failed sidewalk squares, the Village also installs Americans with Disabilities Act (ADA) required handicapped ramps at intersections and replaces select curbs adjacent to the sidewalks. oThe Village replaces approximately 6% of its sidewalks each year. oThe Village's contractor performs all replacements. Staff anticipates in-house engineering design for this project will occur in FY 2026 and construction for this project to take place in FY 2027 The project is included in the city 2027 - 2031 Capital Improvement Program (CIP). As of July 10,2026, further details have not yet been identified. The project is included in the city 2027 - 2031 Capital Improvement Program (CIP). As of July 10,2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

$483,296.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
602
Active Projects
20
Bidding Soon
4,594
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

Multiple Locations, Northbrook, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.