BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 24, 2026 at 8:00 PM

Updated July 30, 2026

Renovation of a municipal facility in East Fayetteville, North Carolina. Completed plans call for the renovation of a three-story above grade municipal facility.

Renovation of the 3rd floor of the City Hall building. SDBE/HUB Participation Goal for this Project: 10% Question Deadline 07/14/2026 at 5:00 PM ET Questions regarding this bid must be submitted in writing by e-mail to Kimberly Toon, Purchasing Manager, at COFbiddingquestions@fayettevillenc.gov The project consists of the renovation of an existing storage room located on the 3rd floor of City Hall at 433 Hay Street, Fayetteville, NC 28301. The renovation will convert the existing space into three equally sized private offices and an adjoining corridor. The work shall include all associated architectural, mechanical, electrical, IT/data, fire sprinkler, and life safety modifications necessary to provide compliant egress and meet applicable City of Fayetteville standards and code requirements.

Post-Bid

$2,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
104
Bidding Soon
1,936
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2026

October 1, 2026

Project location map

433 Hay St, East Fayetteville, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.