Published July 25, 2026 at 8:00 PM

Updated July 27, 2026

Demolition, site work and renovation of a water / sewer project in The Villages, Florida. Completed plans call for the renovation of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

Replacement of sludge holding blowers and removal of building structure at the LSSA Wastewater Treatment Plant. All questions received by 4:00 pm on Friday, July 31 , 2026 will be considered . Questions will not be answered over the phone. Questions must be in writing and emailed to Veronica Salazar at veronica.salazar@districtgov.org or submitted though the OpenGov Procurement Portal at https://procurement.opengov.com/portal/districtgov/projects/270682. SCOPE OF SERVICES LSSA WWTP Sludge Holding Blower Replacement and Building Removal The facilities are owned and operated by the Villages Center Community Development District (VCCDD). The project includes the replacement of the existing three (3) positive displacement blowers with three (3) 60 hp EE- PAC high efficiency screw blowers by Universal Blower Pac. Qualified firms wishing to respond to "LSSA WWTP Sludge Holding Blower Replacement and Building Removal" must provide all labor, services, equipment and materials described in this document, whether directly or through sub-contractors/sub-consultants. Firms are required to submit an AIA G703 or equivalent - Schedule of Values for this project in accordance with the requirements of the C700/C800 Contract Documents. The District does not furnish AIA forms. Work on this project will begin upon awarded Contractor's receipt of Notice to Proceed , with Substantial Completion expected in 210 days and Final Completion within 240 days. The completion date may be extended due to unforeseen circumstances with the approval of the District . Successful Contractor will be responsible for all work according to the attached project requirements to include all materials, labor, equipment and permitting required to complete the project in a timely and professional manner. Successful contractor and any subcontractors will be required to attend a pre-construction meeting after the bid award is approved by Village Center Community Development District and the Agreement has been executed by all parties. 5.2. GENERAL SPECIFICATIONS It is the intent of these specifications to describe a complete project fully acceptable to the District. Even though certain details may have been unintentionally omitted, the Contractor shall nonetheless perform all work necessary to complete the project to the highest industry standards and acceptable to the District. All materials and workmanship shall be first class and shall conform to the highest industry standards or the specifications, whichever requirements are more stringent. The work includes, but is not limited to, the following: 1. Mobilization/Demobilization, General Requirements, Bonds, and Insurance.3. Demolition Work a. Demolition of air piping as shown in the drawings. b. Demolition of positive displacement blowers as shown in the drawings. c. Demolition of concrete slab and concrete equipment pads as shown in the drawings. d. Demolition of noise suppression blankets and metal studs as shown in the drawings. 4. Installation Work a. Installation of air piping as shown in the drawings. b. Installation of new screw blowers and associated piping as shown in the drawings. c. Installation of equipment pads as shown in the drawings. d. Installation of electrical equipment as shown in the drawings. The Contractor is responsible for obtaining all necessary permits and furnishing all materials, equipment, supplies, and appurtenances; provide all construction equipment and tools; and perform all necessary labor and supervision. 2. Site Work a. Erosion Control b. Site restoration including seeding and sodding. c. Yard piping

GC Bidding

$1,500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
410
Active Projects
99
Bidding Soon
2,702
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2026

October 12, 2026

Project location map

2450 El Camino Real, The Villages, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.