BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 10, 2026 at 8:00 PM

Updated September 13, 2026

Site work and new construction of a water / sewer project in Palmdale, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Drilling, construction, development, and testing of one monitoring well, one injection well, and one municipal water supply well. Question Submission Deadline:July 24, 2026, 5:00pm If any person or entity contemplating submission of a bid for the proposed Contract is in doubt as to the true meaning of any requirement of the Contract Documents, or finds discrepancies in or omissions from the Contract Documents, they shall submit to the Engineer The Work to be constructed hereunder is located on North of E. Avenue Q and south of E. Avenue P, between 25th Street E and 27th Street E , in the City of Palmdale, Los Angeles County, California, in Palmdale, California Question Submission Deadline July 31, 2026, 5:00pm The work to be performed under this Contract consists of furnishing all labor, equipment, materials, and forces necessary for the drilling, construction, development and testing of one (1) monitoring well, designated MW- 1, one ( 1) full-scale injection well , designated IW- 1, and one (1) municipal water supply well , designated Well 37. The monitoring and injection wells are part of a site characterization drilling program in support of the Palmdale Water District (PWD) Pure Water Antelope Valley (PWAV) project. The primary goal of the PWAV project is to develop a drought-resilient water supply for the Antelope Valley area through replenishment of the groundwater basin by injection of treated wastewater. The primary goal of the site characterization program is to refine understanding of area aquifers from which an existing groundwater model can be validated and refined to confirm regulatory compliance. Among other things, this proposed program will include installation and testing of an injection well and hydraulically downgradient monitoring well to better characterize the subsurface lithology and geochemistry, estimate potential full-scale injection capacity, and estimate aquifer transport properties. The Engineer's Opinion of Probable Construction Cost for the PWAV Site Characterization Drilling Program is approximately $ 1,500,000 to $ 1,800,000 total . *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid results MW-1 - Best Drilling and Pump, Inc - $805,186.00 IW-1 - Zim Industries, Inc dba Bakersfield Well - $3,049,295.00

Award

$3,049,295.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
657
Active Projects
255
Bidding Soon
4,076
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.