Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 9, 2026 at 8:00 PM

Updated October 15, 2026

Site work and new construction of a water / sewer project in Crescent City, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Question Deadline 08/03/2026 at 5:00 PM PT Questions regarding the Plans and Specifications shall be submitted in writing to Rosanna Bower and Jonathan Olson at 981 H Street, Suite 110, Crescent City, CA 95531 , or by email at rbower@co.delnorte.ca.us and jonathan.olson@co.del-norte.ca.us The Work at the lift station site generally includes but is not limited to, site preparation and grading, concrete pad construction , installation of a fixed-position propane generator (provided by Owner), propane tank, generator enclosure, security fencing and miscellaneous electrical hardware switches and wiring, and connections to electrical and communication panels as shown on the Plans and described in these Specifications. The Contract Documents are currently available and may be examined at the following locations Humboldt Builders Exchange, Eureka North Coast Builders Exchange, Santa Rosa Shasta Builders Exchange, Redding Construction Bidboard, San Diego Medford Builders Exchange, Medford Dodge Data & Analytics, New York Placer County Contractors Association & Builders Exchange, Roseville Site preparation and grading, concrete pad construction, installation of a fixed-position propane generator, propane tank, generator enclosure, security fencing and miscellaneous electrical hardware switches and wiring, and connections to electrical and communication panels. Award is subject to final approval.

Award

$304,189.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
14
Bidding Soon
192
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2026

October 9, 2026

Project location map

Multiple Locations, Crescent City, CA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed