BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 21, 2026 at 8:00 PM

Updated July 26, 2026

Site work and renovation of a water / sewer project in Wheaton, Illinois. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Public-side lead service line replacements (LSLRs) to comply with the Lead Service Line Replacement and Notification Act. All questions, either administrative or technical, shall be submitted via email to Tony Sperkowski at asperkowski@wheaton.il.us no later than July 28, 2025 at 11:00 am (CST). The City has a multi-year full LSLR program. The 2026 LSLR program consists of a total of approximately 50 publicside lead service line replacements. Work includes replacement of Public Lead Service Lines between the existing water main and the B-box in the parkway The project includes restoration of outside areas such as sidewalks, driveways, roadway patching and sodding which is described in the attached specifications. The work to be done under this contract includes but is not limited to; the providing of all labor, materials, supervision, equipment, services, incidentals, and related items necessary to complete the work in accordance with this specification and scope of work. All work is to be performed in accordance with all applicable federal, state, county and local laws, ordinances, and codes; and in accordance with the detailed Specifications included herein. The City may add, delete, or change the work locations or details of the marking layouts at any time during the work period, with at least two (2) working days prior notice to the Contractor. The Contractor shall complete all Work as specified or indicated in the Contract Documents. The work consists of replacing approximately 50 lead water services, between the existing water main and the B-box in the parkway. Work also includes surface restoration items such as sidewalk, driveways, roadway patching and sodding. The average length of service, from the water main to B-box, is estimated to be 10 ft. for Near Side services and 45 ft. for Far Side service The breakdown of the 20% includes: 11% minority-owned businesses; 7% women-owned businesses; and 2% businesses owned by persons with a disability.

GC Bidding

$1,500,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
564
Active Projects
181
Bidding Soon
4,205
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2026

August 15, 2026

Project location map

Multiple Locations, Wheaton, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.