Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 21, 2026 at 8:00 PM
Updated July 26, 2026
Site work and renovation of a water / sewer project in Wheaton, Illinois. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Public-side lead service line replacements (LSLRs) to comply with the Lead Service Line Replacement and Notification Act. All questions, either administrative or technical, shall be submitted via email to Tony Sperkowski at asperkowski@wheaton.il.us no later than July 28, 2025 at 11:00 am (CST). The City has a multi-year full LSLR program. The 2026 LSLR program consists of a total of approximately 50 publicside lead service line replacements. Work includes replacement of Public Lead Service Lines between the existing water main and the B-box in the parkway The project includes restoration of outside areas such as sidewalks, driveways, roadway patching and sodding which is described in the attached specifications. The work to be done under this contract includes but is not limited to; the providing of all labor, materials, supervision, equipment, services, incidentals, and related items necessary to complete the work in accordance with this specification and scope of work. All work is to be performed in accordance with all applicable federal, state, county and local laws, ordinances, and codes; and in accordance with the detailed Specifications included herein. The City may add, delete, or change the work locations or details of the marking layouts at any time during the work period, with at least two (2) working days prior notice to the Contractor. The Contractor shall complete all Work as specified or indicated in the Contract Documents. The work consists of replacing approximately 50 lead water services, between the existing water main and the B-box in the parkway. Work also includes surface restoration items such as sidewalk, driveways, roadway patching and sodding. The average length of service, from the water main to B-box, is estimated to be 10 ft. for Near Side services and 45 ft. for Far Side service The breakdown of the 20% includes: 11% minority-owned businesses; 7% women-owned businesses; and 2% businesses owned by persons with a disability.
GC Bidding
$1,500,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 4, 2026
August 15, 2026
Multiple Locations, Wheaton, IL
Related To This Project
Wheaton, IL
Bid Date: Aug 05 2026
Wheaton, IL
--
Wheaton, IL
Bid Date: Aug 04 2026
Wheaton, IL
Bid Date: Jul 22 2026
Wheaton, IL
Bid Date: Jul 23 2026
Wheaton, IL
--
Wheaton, IL
Bid Date: Jul 17 2026
Wheaton, IL
Bid Date: Jul 21 2026
Wheaton, IL
Bid Date: Jul 22 2026
Wheaton, IL
--
Wheaton, IL
Bid Date: Jul 23 2026
Wheaton, IL
Bid Date: Jul 23 2026
Wheaton, IL
Bid Date: Jul 01 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
